1 | EG, PEG, EGH |
|
Installation (continued)
Jacket installation (Factory installed on PEG boilers)
1.Remove the proper knockout discs from panels as shown in tapping table, page 6.
Tankless and storage heater knockouts must be removed for EG and EGH boilers with optional tankless heaters prior to jacket installation.
2. Follow Jacket Instructions in jacket carton.
Spill switch installation
On EG
Damper installation
If damper will be installed, see Control Supplement for information.
Draft hood installation
Attach draft hood to flue collector hood using #10 x 1/2" sheet metal screws provided. Use boiler cement furnished to provide gas tight seal.
Failure to maintain
Do not alter boiler draft hood or place any obstruction or
Figure 10 Draft hood
Seal across back of block assembly with boiler cement between cast iron and sheet metal edge of draft hood
Breeching erection
Connect from draft hood or damper outlet to chimney or vent with same size breeching. Where possible, vertical venting to the outside from draft hood or damper outlet will offer best performance. Where horizontal breeching is used, slope upward at least 1/4 inch per lineal foot toward chimney or vent and support with hangers to prevent sagging.
A vertical height of 3 feet to 5 feet of breeching before any elbow or horizontal breeching is recommended to reduce chances of flue gas spillage at draft hood on
Breeching must not be connected to any portion of a mechanical draft system operating under positive pressure.
8 | Part Number |