Weil-McLain EG manual Installation continued, Front and back base panels, Burner drawer assembly

Models: EG

1 28
Download 28 pages 32.84 Kb
Page 7
Image 7
Figure 5 Front and back base panels
(Factory installed on PEG boilers - follow

1

EG, PEG, EGH GAS-FIRED BOILERS SERIES 4 — BOILER MANUAL

 

Installation (continued)

Figure 5 Front and back base panels

Figure 6 Burner drawer assembly

Installation of drawer assembly and front access panel and back base channel

steps 2 and 3)

1.The drawer assembly consists of the burner drawer, main burners, gas manifold, pilot burner, etc. See Figures 6, 7 and 8 for installation.

2.Check for proper orifice sizing from chart below.

Proper orifices must be used. Failure to do so will cause severe personal injury, death or substantial property damage.

3. Level and straighten burners.

Burners must be properly seated in slots in back burner support with openings facing up. Gas orifices must inject down center of burner. Failure to properly seat burners will result in severe personal injury, death or substantial property damage.

4.Install front access panel and back base channel. See Figure 9.

5.Install rollout thermal fuse element with wire terminals facing up on front access panel of EG 30-75 boilers only as shown in Figure 9. Wire per Control Supplement.

Figure 7 Pilot burner location

Figure 8 Burner drawer installation

Figure 9 Access panel

Part Number 550-110-639/0703

7

Page 7
Image 7
Weil-McLain EG manual Installation continued, Front and back base panels, Burner drawer assembly, Pilot burner location