LIFT MOTOR / LIFT ROD
ASSEMBLY INSTRUCTIONS
A.LIFT ROD BUSHING
1.The top bushing assembles through the TOP PANEL and FRAME. The WAVE WASHER and JAM NUT go BELOW top part of frame.
2.The bottom bushing assembles through the top hole in the
FRAME BACK PANEL.
B.LIFT MOTOR
1.Apply voltage to the BLACK and WHITE wires of the motor until the screw stops turning. This is the
2.Assemble the LIFT MOTOR to the MOTOR MOUNT PLATE with four bolts and threadlock.
C
A
D
C.CRADLE PIVOT
1.Assemble the CRADLE PIVOT to the LIFT ROD.
2.The SET SCREW on the PIVOT COLLAR must be centered on the flat on the LIFT ROD.
A
D.LIFT ROD YOKE
1.Slide the fingers of the YOKE over the flats of the BRASS NUT. The set screws must be on the side away from the motor.
2.Slide the PIVOT / LIFT ROD through the top BUSHING, YOKE, bottom BUSHING and LIFT ROD GUARD. The CRADLE PIVOT must be parallel to the rear portion of the TOP PANEL, with the downturned lip of the PIVOT toward the front of the fryer.
3.Center the YOKE on the flats of the BRASS NUT, then tighten the YOKE SET SCREWS on the flat on the LIFT ROD.
4.Apply voltage to the motor leads and carefully observe the end points of the
B
TOP PANEL
LIFT ROD
LIFT ROD |
BUSHING |
FRAME |
LIFT |
MOTOR |
YOKE |
LIFT ROD |
BUSHING |
FRAME |
BACK PLATE |
MOTOR |
MOUNT |
PLATE |
17