EQUIPMENT INSTALLATION AND SET-UP
A.INITIAL INSTALLATION
1.A single
DO NOT obstruct or restrict ventilation and
2.Setup the FRYER only on a firm, level surface. Clearances from all combustible and non- combustible construction is 1” minimum. The area around the fryer must be kept clear of flammable and combustible materials.
3.LEVELING: Verify that the fryer sits firmly ON BOTH CASTERS AND ON BOTH LEGS. With a spirit level, check that the fryer is level
4.DO NOT obstruct the flow of the two exhaust flues (item 14) at the top rear of the fryer. It is especially critical that gas supply piping and electrical supply cord and/or receptacle be routed away from the path of the hot combustion fumes.
5.This fryer must be installed and operated under a ventilation hood conforming to all applicable local codes. Combustion fumes must be vented in accordance with local codes.
6.Cooking and cleaning functions require unobstructed access. The frypot, control panels, cooling slot (item 16) and front access door must be maintained free from obstructions. The rear access panel must be accessible for maintenance.
KEEP THIS AREA CLEAR
14. EXHAUST GAS FLUE FRYPOT 16. COOLING SLOT
UPPER CONTROL PANEL
LOWER CONTROL PANEL
23. DATA PLATE
BURNER ASSEMBLIES FRONT ACCESS DOOR GAS VALVES
LIFT MOTOR |
ACCESS |
23. GAS CONNECTION |
22. ELECTRICAL |
CONNECTION |
FRONT VIEW
BACK VIEW
4