2. Have a second person hold the Base (52) in the | 2 |
|
|
|
|
|
|
position shown. |
|
|
|
|
|
| |
Identify the Left Upright (53) (the Right Upright |
|
| Large |
|
|
|
|
[54] has a large hole near the lower end). |
|
|
|
|
|
| |
Hold the Left Upright (53) so that the two indi- |
| 54 | Hole |
| 2 |
|
|
cated small holes are on top. Attach the Left |
|
|
|
|
|
| |
Upright to the Base (52) with two M10 x 58mm |
|
|
|
| 52 |
|
|
Bolts (2). Do not tighten the Bolts yet. |
|
|
|
|
| 2 | |
Attach the Right Upright (54) to the Base (52) in |
| Small Holes |
|
|
| ||
the same way. |
|
|
|
|
| ||
|
|
|
|
| 53 |
|
|
3. Slide the two Wheel Housings (45) onto the Base | 3 |
|
| 32 |
|
|
|
(52). Attach each Wheel Housing with two M6 x |
| 45 | 43 |
|
| ||
58mm Bolts (13), two M6 Flat Washers (32), and |
|
|
|
|
| ||
two M6 Nuts (43). |
| 13 |
| 32 |
| 32 |
|
|
|
| 45 | 43 | |||
|
|
|
|
| |||
|
|
|
|
|
| ||
|
|
|
|
| 13 | 32 |
|
|
|
|
|
| 52 |
|
|
4. Remove the bolts (not shown) from the indicated | 4 |
|
|
|
|
|
|
holes in the Hood (65) (only one side is shown). |
|
|
|
|
|
| |
Remove the cardboard packaging and discard |
| 39 | Wire Tie |
|
| ||
the bolts. |
|
|
| ||||
Position the Base (52) as close to the front of |
|
|
|
|
|
|
|
the treadmill as possible. |
|
|
| 54 |
|
|
|
See the inset drawing. Locate the wire tie in |
| 65 |
|
|
|
| |
the Right Upright (54). Tie the wire tie securely |
|
|
|
|
|
| |
to the connector on the end of the Wire Harness |
|
| Hole |
| 54 |
|
|
(39). Next, pull the opposite end of the wire tie |
|
|
|
|
| ||
out of the upper end of the Right Upright, until |
|
|
|
|
|
|
|
the Wire Harness is routed completely through |
|
|
|
| 39 |
|
|
the Right Upright. Secure the Wire Harness to |
|
|
|
|
|
| |
the upper end of the Right Upright so that it will |
|
|
|
|
|
|
|
not fall inside. |
|
|
|
| Wire Tie |
|
|
|
|
| 52 |
|
|
| |
|
|
|
|
|
|
| |
| 7 |
|
|
|
|
|
|