Westinghouse ETL-ES-GW-ContempraTrio-MN08 Blade Installation Instalación de las paletas

Models: ETL-ES-GW-ContempraTrio-MN08

1 20
Download 20 pages 17.1 Kb
Page 10
Image 10
Blade Installation

ETL-ES-GW-ContempraTrio-MN08

Blade Installation

Instalación de las paletas

11

Attach blade brackets to blades using the blade bracket screws (1), metal washers (2), and fabric washers (3), if provided. NOTE: Some models do not utilize fabric washers (3).

Fije los soportes para paletas a las paletas con los tornillos (1), las arandelas de metal (2) y las de tela (3), si corresponde. NOTA: Algunos modelos no utilizan arandelas de tela (3).

12

2

2

1 Manual backgroundManual backgroundManual background

Check the motor for plastic shipping stabilizer tabs (1), and remove them if they are present. Attach blade assembly to motor using the noise-dampening motor gaskets (2) and motor screws provided. Tighten screws ecurely. NOTE: Some models do not utilize motor gaskets, washers, or stabilizer tabs.

Verifique si hay lengüetas plásticas de embalaje para sostener al motor (1) y descártelas. Fije el conjunto de las paletas al motor usando las juntas reductoras de sonido del motor (2) y los tornillos para el motor incluidos. Apriete los tornillos asegurándolos. NOTA: Algunos modelos no utilizan juntas para el motor, arandelas o lengüetas de embalaje.

10

Page 10
Image 10
Westinghouse ETL-ES-GW-ContempraTrio-MN08 owner manual Blade Installation Instalación de las paletas