Westinghouse LCM - 19v5 manual Turn the Power On, Connect Power Cables, English

Models: LCM - 19v5

1 24
Download 24 pages 49.61 Kb
Page 11
Image 11
3. Connect Power Cables

3. Connect Power Cables

Connect the AC power adapter cord to the LCD Monitor (to the connector labeled “AC-IN”) and then connect the female AC power cord to the adapter. Plug the AC power cord into a properly grounded AC outlet.

4.Turn the Power On

Press the power button on the front of the LCD monitor. The LED light will turn blue if a signal input is detected or it will be orange if no input is detected.

9

English

Page 11
Image 11
Westinghouse LCM - 19v5 manual Turn the Power On, Connect Power Cables, English