INSTRUCCIONES DE MONTAJE Y CABLEADO

NOTA: Underwriters Laboratories (U.L.) no requiere que todos los artefactos tengan cables de tierra. Estos artefactos cumplen con todas las especificaciones U.L.

1.Desconecte el suministro eléctrico en la caja de fusibles para evitar la posibilidad de descarga eléctrica.

2.Enrosque el niple (A) en el orificio central de la barra de montaje (B) aproximadamente 6 mm (1/4 pulg.) (vea la fig. 1).

3.Asegure la arandela de presión (C) y la tuerca (D) al niple (A) de la barra de montaje (B).

4.Fije la barra de montaje (B) a la caja de embutir (E) (vertical u horizontalmente, vea la fig. 1) con los tornillos correspondientes (F) (no incluidos).

5.Para conectar los cables, tome el cable negro del artefacto (grupo A de la fig. 2) y colóquelo uniformemente contra el cable negro de la caja de embutir. No retuerza los cables.

6.Coloque un conector de rosca (G de la fig. 1) sobre los cables y enrósquelo hasta que lo sienta firme. Si el conector para cables (G) se desprende fácilmente, vuelva a ajustar el conector y compruebe una vez más que la conexión esté firme.

7.Repita los pasos 5 y 6 para conectar el cable blanco del artefacto (grupo B de la fig. 2) y los cables de la caja de embutir.

8.Enrosque parcialmente el tornillo verde de tierra (H) en el orificio lateral (I) de la barra de montaje (B) (vea la fig. 1).

9.Enrolle el cable de tierra del artefacto y el cable de tierra de la caja de embutir (de metal o con forro verde) (E) en el tornillo verde de tierra (H) que está en la barra de montaje (B).

10.Ajuste el tornillo verde de tierra (H). No apriete demasiado.

11.Introduzca los cables dentro de la caja de embutir (E).

INSTRUCCIONES DE MONTAJE DEL ARTEFACTO

Advertencia: Este artefacto es para uso en interiores solamente.

1.Coloque la placa posterior (J) sobre el niple (A).

2.Asegúrela en su lugar con la(s) tuerca(s) tapa (K).

3.Asegure la(s) pantalla(s) de vidrio (L) en el(los) soporte(s) (M) con los tornillos de mariposa

(N) o con el(los) anillo(s) de sujeción (O) según corresponda.

4.Instale la(s) lámpara(s). No exceda el vataje recomendado.

5.Conecte nuevamente el suministro eléctrico en la caja de fusibles.

10

Page 10
Image 10
Westinghouse W-349 owner manual Instrucciones DE Montaje Y Cableado, Instrucciones DE Montaje DEL Artefacto

W-349 specifications

The Westinghouse W-349 is a prominent model in the landscape of nuclear reactors, specifically designed for its unique operational capabilities and safety features. As a pressurized water reactor (PWR), the W-349 operates by using water as both a coolant and a neutron moderator. This dual functionality ensures efficient heat transfer while maintaining a stable reactor core environment.

One of the main features of the W-349 is its commitment to safety. The reactor incorporates advanced safety systems, including redundant cooling mechanisms and rigorous containment structures designed to withstand extreme conditions. The control systems employed leverage state-of-the-art digital technology, enabling real-time monitoring and adjustments. This automation not only enhances operational efficiency but also significantly reduces the likelihood of human error.

In terms of performance, the W-349 boasts an impressive thermal output, typically operating at a capacity of around 1,000 megawatts. This level of output allows the reactor to serve as a cornerstone in the energy grid, providing reliable power to countless homes and businesses. The design incorporates efficient fuel usage, with advanced uranium fuel rods that extend the intervals between refueling, thereby decreasing operational downtime.

Another significant characteristic of the W-349 is its modular design, which facilitates easier maintenance and upgrades. This modularity allows for components to be replaced or enhanced without necessitating extensive shutdowns, thus ensuring that energy production remains consistent year-round. Furthermore, the reactor is designed with seismic resilience in mind, ensuring stability in the event of earthquakes or other geological disturbances.

The W-349 also emphasizes environmental considerations. It is engineered to minimize radioactive waste through advancements in fuel recycling and management technologies. This commitment to sustainability aligns with the growing global focus on reducing carbon footprints while meeting energy demands.

In summary, the Westinghouse W-349 combines cutting-edge technology with stringent safety features and impressive operational efficiency. Its robust design, advanced safety protocols, and environmental sustainability make it a pivotal player in the field of nuclear energy, paving the way for future advancements in energy production while addressing the pressing needs of modern society.