Check Operation
Start the unit by turning the service | d | |
switch to “ON”and opening the line | ||
| ||
water valve. |
| |
NOTE: Left is “OFF”- Middle is “ON”- |
| |
Right is “CLEAN.” In “CLEAN”position, |
| |
only the pump operates. |
| |
Check condenser fan to make sure it is |
| |
revolving. Check for airflow. Do not | d | |
insert hand into fan area. | ||
| ||
Water will not enter pump pan until |
| |
freezing plate gets cold and machine |
| |
goes into a harvest cycle. |
|
Check for even water flow over freezing plate. Unit must be level for proper operation.
Check for desired cube thickness and after 24 hours adjust if necessary. Max- imum ice yield will be obtained with ice thickness at %” (13 mm) to %” (16 mm).
Replace grille.