Figure 19
IG
UNIT
1
CENTER UNIT IN
AVAILABLE | OPENING | ROOM SIDE |
20. Drill g/64” holes in the window jamb top to line up with holes in filler frame (see Figure 19). Use two thread cutting screws (Item 13) to secure unit. If you need additional hold- ing strength, add to screws at the bottom of the unit side channels (see Figure 14 on page 7).
1l Unpack mounting parts before installing your air conditioner. Be sure you have all the necessary parts (see Figure 20 and 21). This air conditioner will fit most steel casement windows. A normal installation can be made with a screwdriver, 5/16” socket driver, tape measure and drill.
Figure 20
z Installation Instructions
CAUTION:
lBe sure air conditioner does not fall out of window during installation.
l Handle the air conditioner with care. Watch out for the sharp metal fins on the front and rear coils.
lDo not use the collected water for drinking purposes. It is not sanitary.
Figure 21 | KNURLED KNOB | |
.@ SCREWS | ||
|
1. x10x | 3f8” Long SM. Screw | 4. Knurled | Knob Screw |
2.Y
3.Bottom fvlounting Bracket
NOTE: Abova Parts (Not Shipped Loose) installed on unit by factory.
2. Pick the right window. First, decide what room(s) you want to cool. Then choose a window that will allow the
the ELECTRICAL REQUIREMENT page for type of receptacle and wiring needed.) Do not use an extension cord. To be able to use the window mounting parts shown in Figure 20, the window should have a minimum width of
have | a | minimum | height of | and | |
maximum | height | of 1 | (see | “B” in | |
Figure | 22). |
|
|
|
8