4l Remove
5. Install plastic
cabinet. (See Figure 4.) Spout should be facing downward through hole.
8. Ground unit to cabinet by using green ground wire attached to
and in lower
9l If necessary, drill 3/16” diameter hole in cabinet for ground wire (see Figure 7). Place
remaining length of wire under front lip of base behind plastic front panel.
6. Remove paper backing from 3 seal strips and attach them to the top flange as well as to the right and left side of unit (see Figure 5).
7l Install unit into cabinet. First, check tubing. Realign tubing if it is rubbing adjacent tubes
or extending outside the flange of base unit. Now slide unit into cabinet until it rests against rear embossed stops (see Figure 4). Be careful not to push against sharp fins and plastic parts.
Figure 5 /SEAL STRIP7
10l Remove protective wrapping from control panel. Place control panel in position and insert control knobs through holes in control panel and onto control shafts (see Figure 7).
11l Attach front panel by placing bottom edge on clips and pushing top down, then in and up.
Figure 7