6.Pull the support angle against the outside of the structure. Tighten two 36” long machine screws on top of the support platform.
ne screws
window track
7.Adjust the leveling bolt to position the support angle in a level plane. This will allow for proper angle. Tighten the leveling bolt locknut. The air conditioner must be tilted back slightly to facilitate proper condensate disposal.
NOTES: Be sure the window track is securely attached to the building con- struction. Use longer screws into the subframing if necessary.
Do not drill a hole in the bottom pan. The air conditioner is designed to operate with approximately W’ of water in the bottom pan.
8. Cut two | pieces of adhesive back foam | Top retainer | Filler panel |
seal equal to the height of the window |
|
| |
opening. Remove backing and apply to |
|
| |
the vertical inside edges of the window |
|
| |
frame and sliding sash that will rest |
|
| |
against | the air conditioner. |
|
|
9.Replace the sliding sash in the window frame.
Foam seal
10 | Channel |