9.Remove either top or rear rectangular knockout. If using 7" (17.8 cm) round vent, remove both top rectangular knockout and the
A
B
C
A.
B. Top rectangular knockout
C. Rear rectangular knockout
10.Install damper:
A
C
B
C
Vertical vent | B | Horizontal vent |
position |
| position |
A. Up to 1” (2.5 cm)
B.Pivot
C.Damper/vent connector
Rectangular vent only:
Attach damper/vent connector over knockout opening. Make sure damper pivot is nearest to top/back edge of hood. Remove tape from damper flap.
NOTE: For horizontal vent systems, it is recommended that the rectangular ventwork be attached to the damper/vent connector and sealed with duct tape before installing the hood.
Round vent only:
Replace round vent plate removed in step 1 of “Prepare the Hood” section.
Install a 7" (17.8 cm) round damper (must be purchased separately). The damper flap must open freely in the direction of air flow (away from range hood).
NOTE: Damper/vent connector and round vent plate can be installed up to 1" (2.5 cm) on either side of hood center if ventwork is
Make Electrical Connection
Direct Wiring Installation
WARNING
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.
WARNING
Electrical Shock Hazard
Electrically ground the blower.
Connect ground wire to green ground screw in wiring box.
Failure to do so can result in death or electrical shock.
1.Disconnect power.
2.If not previously done, run wiring through wall or cabinets according to electrical codes and ordinances.
3.Stand hood up as shown. (Keep on protective cover to protect hood and cooking surface.) Feed the power supply cable through the strain relief.
4.Use
5.Use
8