![Connect Vent System](/images/new-backgrounds/56876/5687615x1.webp)
2.Level the blower housing with leveling screws in mounting hooks, using a level across bottom of blower housing.
3.Remove the metal grease filter and secure the blower housing with one screw in the bottom hole located in the rear of the blower.
A
B
A. Rear of blower housing
B. Bottom 5 x 35 screw hole
Connect Vent System
Vented Installations Only
1.Fit vent system over transition piece.
2.Seal connection with clamps.
Make Electrical Connection
WARNING
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.
1.Disconnect power.
2.Remove terminal box cover.
3.Remove the knockout.
Non-vented (recirculating) Installation
1.Assemble the 3 parts of the deflector with 2 - 3.5 x 6.5 screws provided. The assembled deflector should be sized to fit the width of the vent cover bracket installed earlier.
C
A
B
A. Vent cover bracket width
B.Deflector
C.3.5 x 6.5 mm screws
2.Connect the deflector to the vent cover bracket using 4 - 3.5 x 6.5 screws provided.
A
B
A. Vent cover bracket
B. 3.5 x 6.5 mm screws
3.Measure length of 8" (20.3 cm) vent needed to connect the transition to the deflector.
NOTE: Vent should fit up inside deflector a minimum of 1" (2.5 cm).
4.Install vent between the transition and the deflector.
5.Seal all connections with clamps.
A
B
A.Knockout
B.Terminal box cover
4.Install the UL listed or CSA approved strain relief.
A ![A](/images/new-backgrounds/56876/5687615xi6.webp)
![Manual background](/images/new-backgrounds/56876/5687615xi7.webp)
C
B
F E D
A. ½" conduit
B. Terminal box cover
C. UL listed or CSA approved strain relief
D. Green (or bare) wire connected to
F. Black wires
8