Outside Location for Vent Terminal
Upon delivery, check to make sure the packaging has not been damaged.
1.Remove the furnace from box/packaging taking care not to damage the paper template to be used to mark the holes for mounting the furnace.
2.After marking the appropriate holes using the above mentioned template, make a
3.Cut the combustion exhaust and fresh air inlet tubes according to the wall thickness (Figure 2):
Air Inlet Tube Length | = Wall Thickness + |
Flue Outlet Tube Length | = Wall Thickness + |
Figure 2
A + 33.3 mm | A + 2.3 mm |
Ø 49.2
4.Drill the mounting holes “A” (8 holes) in the wall. If possible, use
5.Install the supporting bracket to the wall; insert the air pipe in the wall through the hole provided in the support bracket. Place the round adhesive gasket around the hole, so that the air pipe remains in its position.
6.Attach the supporting bracket with the screws provided. If possible, use
7.Remove the casing loosening the screws and disconnect the casing grounding cable.
8.Place the adhesive spongy lining behind the furnace. (Figure 3)
Figure 3
9.Attach the flue exhaust flue pipe end (diameter 1” 3/8) on the furnace pipe male connection (Figure 5).
BE SURE THAT THE RUBBER SILICONE
10.Remove the front panel by loosing the lateral screws (Figure 4).
11.Install the furnace to the wall leaning the bottom edge of panel “C” (where the fan is located) on the supporting frame, as shown in Figure 6. Attach the furnace to the matching hooks “A”, with light pressure against the wall). Install the heating body of the furnace to the supporting bracket with the two lateral screws.
6