1028835 Hose Kit
Secure Hoses
Secure hoses to the back of right loader upright using plastic tie as shown in Figure 9.
Do not cinch hoses tight, they need to move with the loader during operation.
Figure 9. Secure Hoses
Verify Control Movements
1.Mount loader to tractor: Remove mount pins from loader uprights. Align tractor with loader and slowly drive tractor into loader. Shut off tractor.
2.Connect loader feedline hoses to tractor control valve couplers following color shown in Figure 8.
3.Comply with all safety rules and start the tractor.
4.Mount loader to tractor by activating bucket cylin- ders to raise or lower the loader uprights into the loader mounts. Slowly advance tractor forward, activating appropriate cylinders to engage loader completely into mounts. Insert mounting pins to secure loader.
5.Check that all tractor hydraulic control lever posi- tions operate the loader movements correctly. See Figure 10.
6.If loader movements do not respond correctly, shut off tractor, relieve pressure, and reconnect properly. Loader control movements must be cor- rect before proceeding.
7.Once all loader functions are correct, start the tractor and operate the loader to check for leaks. Purge any remaining air from the hydraulic sys- tem and check oil level.
8.When hose routings and correct loader opera- tions are verified, identify each circuit by placing a matching colored band around the male and female
9.Attach the plastic tie straps (included in kit) every
10.Before operating the loader, make sure that the
●Handle forward - Boom down
●Handle forward to limit - Float position
●Handle back - Boom up
●Handle right -
Dump bucket or attachment (slow)
●Handle right to limit -
Dump bucket or attachment (fast)
●Handle to left - Rollback bucket or attachment
Figure 10. Single Lever Control Operation
MAN0788 (1/16/2009) | Hydraulic Installation 9 |
|
|