Woods Equipment T5070, T5060 Hydraulic Installation, Verification of Control Movements, Hose Kit

Models: T5050 T5040 T5060 T5070

1 20
Download 20 pages 48.49 Kb
Page 12
Image 12
Verification of Control Movements

58025 Hose Kit

Verification of Control Movements

 

 

1. Mount loader to tractor: Remove mount pins

2

from loader uprights. Align tractor with loader and

1

slowly drive tractor into loader. Shut off tractor.

 

2. Connect loader feedline hoses to tractor remote

 

hydraulic couplers. See Figure 12.

 

NOTE: At least 6" spacing should be maintained

 

between valve, bracket, or hoses and any tractor

 

control (brake pedals, accelerator, hand throttle,

 

or hydraulic levers).

 

3. Comply with all Safety Rules and start the tractor.

 

4. Mount loader to tractor by activating bucket cylin-

 

ders to raise or lower the loader uprights into the

 

loader mounts. Slowly advance tractor forward,

 

activating appropriate cylinders to engage loader

 

Control 1, Handle forward -

completely into mounts. Insert mounting pins to

secure loader.

Dump bucket or attachment

5. Check that all hydraulic control lever positions

Control 1, Handle back -

Rollback bucket or attachment

operate the loader movements correctly as

Control 2, Handle forward - Boom down

shown in Figure 15.

6. If loader movements do not respond correctly,

Control 2, Handle back - Boom up

 

shut off tractor, relieve pressure, and reconnect

Figure 15. Tractor Control Operation (Typical)

properly. Loader control movements must be cor-

 

rect before proceeding.

 

7.Once all loader functions are correct, start the tractor and operate the loader to check for leaks. Purge any remaining air from the hydraulic sys- tem.

8.When hose routings and correct loader opera- tions are verified, identify each circuit by placing a matching colored band around the male and female quick-disconnect coupler set. The colored bands will make re-installation easier when the loader is removed from the tractor.

9.Be sure that adequate slack is left in the hoses so they can move as the loader moves through its full range of motion.

10.Attach plastic tie straps every 20" around the hoses to keep them tightly bound and away from contact with the ground or other moving parts on tractor.

11.Before operating the loader, make sure that the Pre-Delivery, Delivery, and Pre-Operation Check- lists in the Loader Operator’s Manual have been completed.

12 Hydraulic Installation

MAN0788 (1/16/2008)

 

 

Page 12
Image 12
Woods Equipment T5070, T5060, T5040, T5050 Hydraulic Installation, Verification of Control Movements, Hose Kit