TIME INTERVAL | INSPECTION OR MAINTENANCE | |
|
| |
Daily or start | Check operation of all functional mechanisms including limit switch operation, | |
of each shift | brakes and control. Check hoist cable for kinks, abrasions, corrosion or broken | |
(\/isual) | wires or evidence of improper spooling on drum. Inspect hooks, upper and lower | |
| blocks, and all load bearing components for damage. | |
|
| |
1 Month | * HOIST CABLE — Inspect and lubricate per paragraph | |
|
| |
1 - 3 Months | * ELECTRICAL CONTROLS — Inspect per paragraph | |
Check hoist gearcase oil level — add oil as required per paragraph | ||
| ||
|
| |
6 Months | * LOWER BLOCK — Inspect per paragraph | |
UPPER BLOCK — Inspect per paragraph | ||
| ||
|
| |
| Motor brake and actuating mechanisms. Inspect and adjust per paragraph | |
Annually | * Inspect hooks with suitable crack detecting procedures per paragraph | |
| Drain and refill hoist gearcase per paragraph | |
|
| |
| Inspect electrical controls per paragraph | |
6 Months or | with oil per paragraph | |
500 - 750 hours | * upper and lower hook block per paragraph | |
“on” time | paragraph | |
| NLGI No. 2 grease to bevel gear. | |
|
| |
5 Years elapsed | Complete inspection, disassembly, and maintenance required. It is recommended | |
time or 5000 | * that your YALE Repair Station be contacted for this service. | |
hours “on” time |
| |
|
|
*Perform services described by paragraph indicated.
Figure 5-2. Inspection and Maintenance Schedule.
|
| |
a. Remove acorn nuts holding brake cover and remove |
| |
brake cover. |
| |
b. Remove brake mounting plate screws and lift brake |
| |
assembly off. |
| |
c. Check braking surfaces for wear and scoring. Replace |
| |
badly worn or scored parts. |
| |
d. Reinstall parts in reverse of disassembly. | 11404A | |
| ||
e. Adjust brake as explained in Section Vll. |
| |
| ||
| Figure | |
| ||
OVERLOAD CLUTCH (Optional). | b. To inspect gearing, pull out intermediate gear and pinion | |
a. The mechanical load brake and gearing may be inspected | assembly and roller thrust bearings (Figure | |
brake assembly (Figure | ||
and serviced with hoist suspended. To do so, remove lower | ||
visual inspection indicates replacement is necessary. | ||
block and wire rope, drain oil from gearcase, remove 12 hex | ||
| ||
head bolts and lockwashers holding gearcase cover, and pull | c. Inspect gears and pinions for signs of tooth wear and | |
cover from gearcase (Figure | damage. If replacement of any parts appears necessary, | |
| disassemble drum gear, intermediate gear and pinion | |
| assembly, and load brake assembly as directed on following | |
| page. |
Page 11