Pre-operation checks

ITEM

ROUTINE

PAGE

 

 

 

Hood

Check that the hood is securely closed.

65

 

 

 

Seat

Check that the seat is securely installed.

45

 

 

 

POST-LAUNCH CHECKS

 

 

 

 

 

Cooling water pilot outlet

Check that water is discharged from the cooling wa-

65

ter pilot outlet while the engine is running.

 

 

 

 

 

Multifunction information

Check the multifunction information center for proper

65

center

operation.

 

 

 

 

Engine idling speed

Check the engine idling speed.

65

TIP:

To ensure safety and reliability, pre-operation checks should be made each time the watercraft is used.

58