AG-Stomp
DISASSEMBLY PROCEDURE
1.Bottom Case (Manhour requirement: 5 min.) Remove the six (6) screws marked [30]. The bottom case can then be removed. (Fig. 1)
Bottom[30]
[30]
[30]:Bind Head Tapping
Fig.1
2.DM Circuit Board
(Manhour requirement: 15 min.)
2-2. DM1/2 Circuit Board (Manhour requirement: 10 min.)
Remove the one (1) screw marked [T110A], three
(3)screws marked [T120], four (4) hexagonal nuts marked [T50A] and four (4) flat washers marked [T60A] from the rear panel and the three (3) screws marked [T110B] from the DM1/2 circuit board. The DM1/2 circuit board can then be removed. Remove the four (4) toothed washer internal tooth forms marked [T70] as well when removing the DM1/2 circuit board from the main body. (Fig. 2)
2-3. DM2/2 Circuit Board (Manhour requirement: 5 min.)
Remove the one (1) hexagonal nut marked [T50B] and one (1) flat washer marked [T60B]. The DM2/2 circuit board can then be removed.
Rear | [T120] |
[T110A] | [T50A][T60A] | [T50B][T60B] |
| [T50]:Hexagonal Nut 9.0 12x2 MFNI33 (LX200060) |
| [T60]:Flat Washer 9x14 0.5 FNM3 (VL802300) |
12 | [T120]:Bind Head Tapping |
|