ASSEMBLY

Unpacking Instructions

1.Wear gloves and eye protection. Remove wood pieces.

2.Cut straps around carton and remove top.

NOTE: Watch for nails and wood splinters.

3.Slide carton sleeve out of bottom tray and lift over Z9.

Assembly Instructions

Frame Assembly

Tools Required:

1.3/4" wrench

2.Ratchet

3.3/4" socket

Lower

 

Frame

Upper

 

Frame

1.Position the Lower Frame inside the Upper Frame.

2.Align holes corresponding to desired position of frame.

3.Secure with eight (8) 1/2” x 1-1/4” hex bolts and eight (8) 1/2” nylon lock nuts.

7

Page 7
Image 7
Yazoo/Kees Z9A manual Unpacking Instructions, Frame Assembly