York H3CE120, H1CE150, H5CE090 installation manual Extending The Service Ports, Installation

Models: H5CE090 H1CE150 H3CE120

1 16
Download 16 pages 25.63 Kb
Page 9
Image 9

035-15407-002-B-0404

TABLE 7 - COOLING CAPACITIES AND POWER REQUIREMENTS

Model

Suction Press. & Corresponding

 

 

 

 

 

Temperature of Air on Condenser Coil, °F

 

 

 

 

Temp. @ Saturation

 

65

75

 

 

85

 

95

105

 

115

 

HCE

 

 

 

 

 

 

PSIG

°F

MBH

 

KW*

MBH

 

KW*

MBH

 

KW*

MBH

 

KW*

MBH

 

KW*

MBH

 

KW*

 

 

 

 

 

 

 

090

61.6

35

90

 

6.1

88

 

6.7

81

 

7.2

77

 

7.9

74

 

8.6

68

 

9.5

 

68.5

40

101

 

6.3

96

 

6.8

91

 

7.4

87

 

8.1

82

 

8.9

77

 

9.7

 

76.0

45

110

 

6.5

109

 

7.0

101

 

7.6

95

 

8.4

90

 

9.1

85

 

10.0

 

84.0

50

120

 

6.6

115

 

7.2

109

 

7.8

104

 

8.6

99

 

9.4

93

 

10.3

120

61.6

35

123

 

7.7

117

 

8.4

112

 

9.1

106

 

9.9

100

 

10.8

95

 

11.8

 

68.5

40

134

 

8.0

128

 

8.6

122

 

9.3

116

 

10.1

110

 

11.0

104

 

12.1

 

76.0

45

145

 

8.2

139

 

8.8

132

 

9.5

126

 

10.4

120

 

11.3

113

 

12.3

 

84.0

50

156

 

8.4

150

 

9.1

143

 

9.8

136

 

10.6

129

 

11.5

123

 

12.5

150

61.6

35

140

 

9.4

133

 

10.4

127

 

11.3

119

 

12.6

112

 

13.8

105

 

15.1

 

68.5

40

151

 

9.6

144

 

10.6

137

 

11.5

129

 

12.8

122

 

14.1

114

 

15.4

 

76.0

45

165

 

9.9

156

 

10.9

148

 

11.8

140

 

13.1

132

 

14.4

124

 

15.8

 

84.0

50

178

 

10.2

169

 

11.2

159

 

12.1

151

 

13.4

142

 

14.8

134

 

16.1

* Includes compressor and condenser fan motor(s).

EXTENDING THE SERVICE PORTS

(Refer to Fig 7.)

1.Loosen the screws securing the service ports in shipping position.

2.Push the service ports through the corner post.

3.Tighten the screws to secure the service ports for installa- tion.

INSTALLATION

Since the condensing units are shipped with a holding charge of refrigerant-22, they can be checked for a refrigerant leak by depressing the stem on either of the service ports that extend through the cabinet. As soon as some internal pressure is re- lieved release the stem. DO NOT release the entire holding charge.

If the unit has already lost its holding charge, it should be leak tested and the necessary repairs should be made. If the unit has maintained its holding charge, you can assume that it has no leaks and proceed with the installation.

CAUTION: Dry nitrogen should always be supplied through a connection while it is being brazed or unbrazed be- cause the temperature required to make or break a brazed joint is sufficiently high to cause oxidation of the copper unless an inert atmosphere is pro- vided. The flow of nitrogen should be continued un- til the joint has cooled.

When making a braze connection, wrap a wet rag around all tubing inside the unit to help prevent damage to other components.

WARNING:The dry nitrogen should always be supplied through a pressure regulating valve.

On HCE090 models only, remove the 4-1/2" x 4-1/2" patch plates from the piping access panel on the front of the unit to ex- pose the refrigerant connections.

Before installing the liquid line between the condensing unit and the evaporator coil, prepare as follows:

1.Burnish the external surfaces of the liquid connection on the condensing unit and the end of the field-supplied piping for the liquid line.

NOTE: Clean surfaces are essential for a well-brazed con- nection.

2.Carefully clean the internal surfaces of the above. Any par- ticles left on these surfaces may lead to a future system malfunction.

NOTE: Use only copper tubing that has been especially cleaned and dehydrated for refrigerant use. If the tubing has been open for an extended period of time, it should be cleaned before being used.

The liquid line connections can now be brazed while maintain- ing a minimum flow of dry nitrogen through the piping as fol- lows:

1.Remove the cap from the 1/4" access port on the liquid line service valve.

2.Connect a supply of dry nitrogen to this access port.

NOTE: The filter-drier should be installed in the liquid line as close to the evaporator coil as possible.

Do not allow the filter-drier to be exposed to the atmos- phere for an extended period of time. Once it absorbs moisture from the atmosphere, it loses its effectiveness.

3.The matched air handlers are shipped with a small R-22 charge and they should be checked for leaks before instal- lation. Drill a small hole through the sealing cap or disc in both the liquid and suction connection. If there is a pres- sure release, the evaporator has no leaks and you can pro- ceed with installation. If the charge has been lost, the coils should be leak tested and the necessary repairs made.

4.Move the dry nitrogen supply from the access port on the liquid line service valve of the condensing unit to the hole through the suction disc on the evaporator coil.

5.Unbraze the coil's liquid line disc while maintaining a flow of dry nitrogen across the connection and through the hole in the liquid line disc.

NOTE: If the liquid line has a solenoid valve, the valve should be opened manually to permit the nitrogen to flow freely.

6.After the disc has been removed, burnish the external sur- faces and clean the internal surfaces as outlined above.

7.Move the dry nitrogen supply back to the access port on the liquid line service valve.

8.Braze the liquid line to the liquid connection on the evapo- rator coil while maintaining a minimum flow of dry nitrogen through the liquid line, the evaporator coil and the hole in the suction disc.

9.Unbraze the disc on the suction connection of the evapora- tor coil while maintaining the flow of dry nitrogen.

Unitary Products Group

9

Page 9
Image 9
York H3CE120, H1CE150, H5CE090 installation manual Extending The Service Ports, Installation