Zephyr ES1-30AW, ES1-E30AS, ES1-E30AB Install Ductwork, Measure The Installation

Models: ES1-E30AB ES1-30AW ES1-E30AS

1 13
Download 13 pages 33.38 Kb
Page 4
Image 4
1. INSTALL DUCTWORK

1. INSTALL DUCTWORK

Plan where and how the ductwork will be installed.

Install proper-sized ductwork, elbow(s) and roof or wall cap for the type of blower you are installing. If using 6’’ (150 mm) round ducts, use a transition. Use 2’’ (50 mm) duct tape to seal duct joints.

Roof cap

3¼” x 10” duct

Roof cap

6” round duct

3¼” x 10” to 6” round transition

Wall cap

HH0011A

Hood

Wall cap

HH0014A

Hood

2. MEASURE THE INSTALLATION

Dimensions for the most common installations are shown below.

We recommend to install the hood at a minimum of 20” (508 mm) from an electric range and at 24” (610 mm) from a gas range.

For optimal performance, the hood should not be installed more than 30” (762 mm) from cooktop.

Cabinets

Hood

20” minimum clearance (24” for gas)

Standard 36” height cooktop

Cabinets

Hood

30” maximum clearance

Standard 36” height cooktop

HH0013A

HH0012A

- 4 -

Page 4
Image 4
Zephyr ES1-30AW, ES1-E30AS, ES1-E30AB installation instructions Install Ductwork, Measure The Installation