ZyXEL Communications Indoor Unit Installation, Initializing the A-6000, Antenna Alignment

Models: A-6000

1 23
Download 23 pages 23.02 Kb
Page 20
Image 20
5.4.Indoor Unit Installation

5.4.Indoor Unit Installation

After the outdoor unit installation is completed, you may follow the procedures below to install the indoor unit.

1.Choose an appropriate place for the network/power injector. You might hang it on the wall or just place it on the desk. Connect the other end of category-5 cable to the “TO RADIO” RJ-45 connector of network/power injector.

2.Connect one end of Ethernet cable to the “TO LAN” RJ-45 port of the network/power injector. Connect the other end of Ethernet cable to the workstation directly or through a switch/hub/router.

3.Connect the power jack of switching power adaptor to the power port labeled as ” POWER” on the network/power injector.

Figure 5-9 Cable Connections of Network/Power Injector

5.5.Initializing the A-6000

1.When plugging the switching power adapter into the 110V/220V wall outlet, the LED named PWR on the network/power injector will light on.

2.When the power and signal connection to outdoor unit are complete, the SYS LED of the network/power injector will light on.

5.6.Antenna Alignment

Please set the SSID, MAC address, and frequency channel at both BU and RU unit. It is highly recommended that you set the security as” HIGH”. Because the throughput are all the same no matter it is set as low, middle, or high.

Please do not unplug the power of POE right after you click the REBOOT icon. If it is required to perform hardware reboot, wait for 30 seconds at least after you clicked the REBOOT icon.

19

Page 20
Image 20
ZyXEL Communications quick start Indoor Unit Installation, Initializing the A-6000, Antenna Alignment