Rubbermaid 5L20 instruction manual Floor Installation, Repeat Floor B

Page 4

2.0

Floor Installation

 

 

 

 

Using a utility knife, cut the long side of each wall slot

 

 

B

b. tab and then use a rubber mallet and screwdriver to

 

 

A

knock it completely out:

 

 

• 4 places on Front Floor (A)

 

 

 

• 8 places on Repeat Floor (B)

 

Using a rubber mallet and

 

 

a. screwdriver, punch out

 

 

the screw holes along

1.

B

the connection edge

 

of Repeat Floor (B).

 

2.

B

A

 

Using a rubber mallet and screwdriver, knock out the

Drill pilot hole through top surface of floor, 2 places on

c. tabs for the door hinge, 2 places on Front Floor (A).

d. Front Floor (A).

 

CAUTION: Drill through top surface of floor only!

A

A

Image 4
Contents 5L20 5L20 Site Preparation Care & USEFloor Installation Repeat Floor BWall Panel C Installation Wall Panel D Installation a Wall Panel E Installation Wall Panel F Installation 3E Views Wall Panel G Installation Wall Panel H Installation a At location indicated by screw target Roof Panel M back position Installation Page Roof Panel J front position & Door Installation Insert pin in slot Finishing Installation Door Finishing InstallationMaintenance & Safety