Rubbermaid 5L20 instruction manual Wall Panel H Installation a

Page 11

d. Snap Front Left Side (G) into Front Floor (A).

G

1

2

click

ALIGN

ALIGN

e. Install Wall Connector (Q) 5 places, connecting Repeat Left Side (C) and Front Left Side (G).

Position connectors in slots and slide down to snap in place.

C

G

OVERHEAD VIEW

G

1 1

Q

2

click

3.5Wall Panel H Installation a.

Using a screwdriver, punch out the screw holes on the top of the Front Right Side (H) 2 places.

Screw Holes

H

H

Image 11
Contents 5L20 5L20 Care & USE Site PreparationRepeat Floor B Floor InstallationWall Panel C Installation Wall Panel D Installation a Wall Panel E Installation Wall Panel F Installation 3E Views Wall Panel G Installation Wall Panel H Installation a At location indicated by screw target Roof Panel M back position Installation Page Roof Panel J front position & Door Installation Insert pin in slot Door Finishing Installation Finishing InstallationMaintenance & Safety