Rubbermaid 5L20 instruction manual Door Finishing Installation

Page 17

5.0 Finishing Installation

a.

 

Install Screws (AA) into 8 locations shown at bottom of wall panels to secure walls to floor.

AA (8)

 

HELPFUL HINT: Pilot holes may be drilled for the screws.

CAUTION: Do not overtighten screws.

5.1 Door Finishing Installation

a. Install Lock Hasp (X) into opening on Right Door (K). b. Install Door Handle (T) onto Left Door (L) using four

Screws (AA).

AA (4)

X

K

click

T

L

Image 17
Contents 5L20 5L20 Care & USE Site PreparationRepeat Floor B Floor InstallationWall Panel C Installation Wall Panel D Installation a Wall Panel E Installation Wall Panel F Installation 3E Views Wall Panel G Installation Wall Panel H Installation a At location indicated by screw target Roof Panel M back position Installation Page Roof Panel J front position & Door Installation Insert pin in slot Door Finishing Installation Finishing InstallationMaintenance & Safety