Rubbermaid 5L20 instruction manual Wall Panel G Installation

Page 10

3.4 Wall Panel G Installation

a. Using a screwdriver, punch out the screw holes on the top of Front Left Side (G) 2 places.

Screw Holes

G

G

Drill a pilot hole (using 1/8" drill bit) in front lower corner

c.

Align the lap joint between Repeat Left Side (C) and

b. at location indicated by screw target.

Front Left Side (G).

Note: This pilot hole is to be drilled through both walls.

 

 

 

 

C

G

 

G

 

 

 

 

G

 

 

OVERHEAD VIEW

 

 

C

 

 

1

 

 

2

Image 10
Contents 5L20 5L20 Site Preparation Care & USEFloor Installation Repeat Floor BWall Panel C Installation Wall Panel D Installation a Wall Panel E Installation Wall Panel F Installation 3E Views Wall Panel G Installation Wall Panel H Installation a At location indicated by screw target Roof Panel M back position Installation Page Roof Panel J front position & Door Installation Insert pin in slot Finishing Installation Door Finishing InstallationMaintenance & Safety