
CAUTIONS
CAUTION: Always use gloves when using a utility knife.
CAUTION: Always use eye protection/safety glasses during assembly.
CAUTION: When installing screws, do not overtighten.
CAUTION: Drill only through initial panel wall, unless otherwise indicated.
CARE & USE
•Shed can be cleaned with water and mild detergent as necessary. DO NOT USE ABRASIVE DETERGENTS,
MATERIALS OR CLEANING TOOLS.
•To maximize your shed’s performance, remove excessive snow and/or leaf accumulation from the roof.
•In the event of severe weather, please disassemble and store in a secure location.
1.0 Site Preparation
FLOOR PLAN:
Size the construction site to fit the entire floor.
OPTIONAL STEP:
If desired, recessed anchor locations (8 places)
can be used to anchor the shed floor to a foundation after you have constructed one.
 ![]()
 24 " 
 24 " ![]()
 
51½"
18"ANCHOR LOCATIONS
 55¼" ![]()
Build a solid, level surface for the shed foundation. Consult your local  | ~5 "  | ||
  | |||
building authority for ordinances, restrictions, or permits required  | 
  | 120.0°  | |
before building any structure at your home.  | 
  | ||
Maximum opening  | |||
Note: Minimum dimensions for foundations shown.  | |||
  | 
  |