Rubbermaid 5L20 instruction manual Site Preparation, Care & USE

Page 3

CAUTIONS

CAUTION: Always use gloves when using a utility knife.

CAUTION: Always use eye protection/safety glasses during assembly.

CAUTION: When installing screws, do not overtighten.

CAUTION: Drill only through initial panel wall, unless otherwise indicated.

CARE & USE

Shed can be cleaned with water and mild detergent as necessary. DO NOT USE ABRASIVE DETERGENTS,

MATERIALS OR CLEANING TOOLS.

To maximize your sheds performance, remove excessive snow and/or leaf accumulation from the roof.

In the event of severe weather, please disassemble and store in a secure location.

1.0 Site Preparation

FLOOR PLAN:

Size the construction site to fit the entire floor.

OPTIONAL STEP:

If desired, recessed anchor locations (8 places)

can be used to anchor the shed floor to a foundation after you have constructed one.

~3-5/8 " 24 " 24 " ~3-5/8 " ~4-15/16 "

~23-9/16"

~51-1/2 "

51½"

18"ANCHOR LOCATIONS

55¼"

Build a solid, level surface for the shed foundation. Consult your local

~5 "

~55-1/4"

 

building authority for ordinances, restrictions, or permits required

 

120.0°

before building any structure at your home.

 

24-7/8"

Maximum opening

Note: Minimum dimensions for foundations shown.

 

 

Image 3
Contents 5L20 5L20 Care & USE Site PreparationRepeat Floor B Floor InstallationWall Panel C Installation Wall Panel D Installation a Wall Panel E Installation Wall Panel F Installation 3E Views Wall Panel G Installation Wall Panel H Installation a At location indicated by screw target Roof Panel M back position Installation Page Roof Panel J front position & Door Installation Insert pin in slot Door Finishing Installation Finishing InstallationMaintenance & Safety