Snapper 7800391 Setting Up the Ground Speed Control Levers, 5/16-18 5/16-18 x 1-3/4, C A B, A B C

Page 11
Image 11
Contents Axion / 150Z Series Initial setupSETUP PROCEDURES TABLE OF CONTENTSAxion / 150Z Series SAFETY RULES GENERAL OPERATIONTRANSPORTING AND STORAGE TOWED EQUIPMENT RIDE-ON UNITS SLOPE OPERATIONCHILDREN EMISSIONSSafe Handling of Gasoline SERVICE AND MAINTENANCEService & Maintenance Front tires 18-20 psi, rear tires 10-12 psi Quick Setup ListCharge the battery Note proceed with other setup steps while battery is chargingFigure 1. Pushing the rider UncratingIMPORTANT NOTE DO NOT TOW RIDERFigure 2. Charging the battery Battery Activation InstallationCharge Battery Install Battery19-25 N.m 14-19 ft. lbs Installing the Seat5/16-18 x 3/4 Figure 5. Installing the seatBB D Installing the Seat Safety SwitchFigure 6. Installing the seat safety switch 20-23 N.m 15-17 ft. lbs Setting Up the Ground Speed Control Levers5/16-18 5/16-18 x 1-3/4 Figure 7. Setting up the ground speed leversFigure 8. Torquing the mower blade hardware 33” Deck Torque Mower Blade HardwareNote Use a wooden block to prevent blade rotation A B 41-54 N.m 30-40 ft. lbs45-55 ft. lbs Figure 10. Torquing the mower blade hardware 50” Deck A B 108-122 N.m 80-90 ft. lbsFigure 9. Torquing the mower blade hardware 42” Deck A B 61-75 N.m Size Check Fluid LevelsReduce & Check Tire Pressures Fill & Check Engine OilFigure 14. Lubrication ground speed control levers LubricationGrease 42” Deck shown, all decks similar Figure 13. Lubrication deckBurnish PTO Clutch CHECK RIDER SAFETY SYSTEMOperational SAFETY Checks