ContentsInitial setup
Axion / 150Z SeriesTABLE OF CONTENTS
Axion / 150Z SeriesSETUP PROCEDURESGENERAL OPERATION
TRANSPORTING AND STORAGESAFETY RULESSLOPE OPERATION
CHILDRENEMISSIONS
TOWED EQUIPMENT RIDE-ON UNITSSERVICE AND MAINTENANCE
Service & MaintenanceSafe Handling of GasolineQuick Setup List
Charge the battery Note proceed with other setup stepswhile battery is charging
Front tires 18-20 psi, rear tires 10-12 psiUncrating
IMPORTANT NOTEDO NOT TOW RIDER
Figure 1. Pushing the riderBattery Activation Installation
Charge BatteryInstall Battery
Figure 2. Charging the batteryInstalling the Seat
5/16-18 x 3/4Figure 5. Installing the seat
19-25 N.m 14-19 ft. lbsInstalling the Seat Safety Switch
Figure 6. Installing the seat safety switchBB DSetting Up the Ground Speed Control Levers
5/16-18 5/16-18 x 1-3/4Figure 7. Setting up the ground speed levers
20-23 N.m 15-17 ft. lbsTorque Mower Blade Hardware
Note Use a wooden block to prevent blade rotationA B 41-54 N.m 30-40 ft. lbs
Figure 8. Torquing the mower blade hardware 33” DeckA B 108-122 N.m 80-90 ft. lbs
Figure 9. Torquing the mower blade hardware 42” Deck A B 61-75 N.m45-55 ft. lbs Figure 10. Torquing the mower blade hardware 50” DeckCheck Fluid Levels
Reduce & Check Tire PressuresFill & Check Engine Oil
SizeLubrication
Grease42” Deck shown, all decks similar Figure 13. Lubrication deck
Figure 14. Lubrication ground speed control leversCHECK RIDER SAFETY SYSTEM
Operational SAFETY ChecksBurnish PTO Clutch