Step 1: Attatch one or more boxes to the grid using two grid straps at the front and two grid straps at the rear. Lift the array.
Step 6: Swing the
Step 2: Roll one box with the front | Step 3: Remove the dolly pin and | Step 4: Roll the next box on a front |
dolly into position and lower the | lift the array. Remove the dolly. | dolly into position. Lower the array |
array to align the bottom box in the |
| and install the two rear hinges |
array to the box with the front dolly. |
| between the bottom array box and |
Install the rear hinges one at a |
| the dolly box as done in step 3. |
time. To ease installation the |
|
|
boxes must be held parallel. Lift |
|
|
the suspended box or the dolly box |
|
|
as necessary to facilitate the hinge |
|
|
installation. |
|
|
Step 7: Roll another box with the | Step 8: Remove the dolly pin and | Step 9: Swing the |
front dolly into position and lower | lift the array. Remove the dolly. | box up and attach the two linking |
the array to align the bottom box in |
| straps at the front to the box |
the array to the box with the front |
| above. Repeat steps 7, 8, and 9 |
dolly. Install the two rear hinges |
| until as necessary to build the |
and two front straps as described |
| array. |
in step 2. |
|
|
Step 5: Remove the dolly pin and lift the array. Remove the dolly.
Step 10: Swing the bottom box up and attach the two linking straps at the front to the box above.
Figure 10:
Flying with Front Dollies
The two boxes must be held parallel during the installation of the rigging hinge. If there is a slight vertical misalignment that causes the hinge to bind during installation, either the suspended box or the box on the dolly may be manually lifted to facilitate the hinge installation. Once both rear hinges are secured, the array is lifted until the box on the Front Dolly is no longer contacting the ground.
The Front Dolly is then removed from the bottom box. Do not attach the front Xvsl rigging straps yet on the bottom box. The array is then raised and another box on a Front Dolly is rolled into position from behind the array. The two Xvhl linking hinges are then simultaneously installed in the rigging on the suspended box and the box on the dolly as previously described.
| 24 |