Karcher HD 4000 C, HD 6000 C operating instructions Maintenance

Page 22

English

E. Maintenance

HD 4000 C / HD 6000 C

Interval

Procedure

Subject Assembly

Activity

By whom

 

 

 

 

 

Semi-

Oil change

All high-pressure pumps

CAUTION!

Operator

annually,

 

 

Hot Oil Scalding Hazard.

 

or after

 

 

Prior to oil change, allow pump to

 

1000

 

 

cool for 15 minutes.

 

operating

 

 

Drain oil and fill pump on each side

 

hours

 

 

with 1.8 L oil, part no. 6.288-061. Do

 

 

 

 

NOT use alternate oil products!

 

 

 

 

 

 

 

Check unit for

Entire water system

Functional faults on valves or pumps

Operator

 

lime deposits

 

may indicate calcification. Use

trained in

 

 

 

procedures outlined on the following

decalcificat

 

 

 

pages.

procedures

 

 

 

 

 

 

Tighten

Control cabinet

Tighten all terminal strips of

Electrician

 

terminal strips

 

components master mains power

 

 

 

 

circuit.

 

 

 

 

 

 

Annually

Safety check

Entire system

Safety inspection pursuant to

Expert/

 

 

 

guidelines covering liquid spraying

Customer

 

 

 

devices. Refer to section A.12.

service

 

 

 

 

 

E5

5.956-648 A10369 (06/98)

Image 22
Contents HD 4000 C Packaging materials Operating InstructionsProper disposal for the sake of our environment Operating mediaTable of Contents System Operating Hazards For Your SafetySafety Instructions and Information EnglishEnglish Hazards posed by defective equipment Hazards posed by AccessoriesHazards during work on the system Authorised Operators Safety Measures on the Installation SiteNoise Protection Personal Protective EquipmentGuidelines and Regulations Protective DevicesEmergency Drill Proper Use of the EquipmentSystem Operation Operating ControlsUsing Emergency-STOP Starting the SystemFrost Protection Switching the System onStopping the System System Shut-DownFlow Diagram System FunctionDescription of Functions Specifications Equipment FeaturesHD 6000 C 967-045 With hot-water Connected Loads Specifications Dimension Diagram Maintenance Contract MaintenanceMaintenance Schedule Maintenance Interval Procedure Subject Assembly Activity By whom Maintenance Maintenance Decalcification Removing the CoverProceed as follows Trouble Shooting Problem Possible Cause Remedy By whomEnglish Problem Possible cause Remedy By whom Trouble Shooting Trouble Shooting High-pressure Installation System InstallationPlacement ConnectionsHard-water Treatment Preparations for CommissioningSpace Assignment Plan Accessories Accessories Customer Service