HD 4000 C / HD 6000 C
G. System Installation
English
AUTHORISED PROFESSIONAL PERSONNEL ONLY
4. Hard-water Treatment
Excessive water hardness (>15° dH) can lead to deposits and result in malfunctions. Contact the manufacturer in the event of unusually high degrees of water hardness.
5. Preparations for Commissioning
nThoroughly rinse entire HD system
(HD 4000/6000 C also). Check entire HD system for correct assembly and lack of leaks.
nComplete electrical connections in accordance with the Specifications contained in the Operating Instructions.
nCheck the function of decalcifying component (if required).
nCheck water supply for required delivery volume and maximum allowable temperature.
nCheck
nInstall float reservoir overflow line
nCheck pump oil level. Remove threaded plug from oil reservoir.
Threaded plug
Adjusting cooling water volume on pressure regulator.
Locking screw
AUTHORISED PROFESSIONAL PERSONNEL ONLY
G2 |