Powermate PM0101400 manual Before Operation, Grounding the Generator, Lubrication, Fuel

Page 6

BEFORE OPERATION

GROUNDING THE GENERATOR

The National Electric Code requires that this product be properly connected to an appropriate earth ground to help prevent electric shock. A ground terminal connected to the frame of the generator has been provided for this purpose. Connecting a length of heavy gauge (12 AWG min.) copper wire between the generator Ground Terminal and a copper rod driven into the ground should provide a suitable ground connection. However, consult with a local electrician to insure that local codes are being adhered to.

GROUND TERMINAL LOCATION:

Ground

Terminal

Do not use a pipe carrying combustible material as the ground source.

LUBRICATION

DO NOT attempt to start this engine without filling the crank case with the proper amount and type of oil. Your generator has been shipped from the factory without oil in the crankcase. Operating the unit without oil can damage the engine.

Fill the engine with oil according to the operator manual. For units with a dipstick, fill oil to the proper level. Units without a dipstick should be filled to the top of the opening of the oil fill.

FUEL

Fill the tank with clean, fresh unleaded automotive gasoline. Regular grade gasoline may be used provided a high octane rating is obtained (at least 85 pump octane). We recommend always using a fuel stabilizer. A fuel stabilizer will minimize the formulation of fuel gum deposits during storage. The fuel stabilizer can be added to the gasoline in the fuel tank, or into the gasoline in a storage container.

Do not overfill the tank. Keep maximum fuel level 1/4 inch below the top of the fuel tank. This will allow expansion in hot weather and prevent overflow.

English

 

6

 

Customer Hotline 1-800-445-1805

 

 

 

 

 

Image 6
Contents Stop AltoTable of Contents Table DES MatieresIndice Safety and Operation Rules Spark Arrester Determining Total WattageKW = 1,000 watts Installation Operating VoltageLubrication Before OperationGrounding the Generator FuelGenerator Features DI HStarting the Engine Starting the UnitPRE-START Preparation Applying LoadPeriodic Maintenance MaintenanceExciting the Generator Service and StorageInfrequent Service Heat ShieldEngine Troubleshooting Engine Specifications Service Information Limited Warranty Powermate Corporation Airport Road Box Kearney, NEVoire la mort Règles D’OPÉRATION ET DE SécuritéPARE-ÉTINCELLES Détermination DE LA Puissance Totale NécessaireVérifier LA Tension Lubrification Avant DE Mettre EN MarcheMise EN Place DE Lappareil CarburantTableau de commande Prise de 120 V, 20 a Caractéristiques DU Groupe ElectrogeneDisjoncteurs Branchement DES Appareils Demarrage DE LappareilPréparatifs AU Démarrage Démarrage DU MoteurLA Bougie D’ALLUMAGE Entretien PériodiqueEntretien LE Type D’HUILEUsage ET Entreposage Depannage DU Moteur Caracteristiques DU Moteur Service Clientele Commande DE Pièces DE RechangeGarantie Limitée Reglas DE Seguridad Y DE Funcionamiento SeguridadApagachispas Como Determinar EL Vataje TotalInstalacion EL Requerimiento DE VoltajeLubricacion Antes DE LA OperacionPuesta a Tierra DEL Generador CombustibleCaracteristicas DEL Generador Panel de control Receptáculo de 120 voltios, 20 amperesInterruptor Arranque DEL Motor Arranque DEL UnidadPreparacion Antes DE Arrancar Como Aplicar UNA CargaBujia Mantenimiento PeriódicoMantenimiento Tipo DE AceiteEscudo DE Calor Servicio Y AlmacenamientoExcitacion DEL Generador Servicio Poco FrecuenteDeteccion DE Fallos DEL Motor Especificaciones DEL Motor Servicio AL Cliente Garantía Limitada Como Pedir LOS RepuestosCustomer Hotline Part Description Descripción QTY Part Description Descripción Powermate Corporation