k)To circuits of Zone 2 only such equipment may be connected that is suitable for operation in this zone and has been certified accordingly (suitable documents have been provided).

l)The devices have to be protected from UV light exposure.

m)The device has to be connected at low inductance with the PE of the system.

n)Spare parts are ordered as complete units giving the material number stated on the device (marking, type label).

o)Do not put stress on the system by bending or torsion.

p)Inside the potentially explosive atmospheres assembly shall only be performed taking the locally applicable rules of erection into account. The following hints have to be observed (incomplete):

(1)Assembly and maintenance to be done only of atmosphere is Ex-free and a hot work permit is in place;

(2)Additional precautions have to be taken if the presence of hydrosulphide, ethylene oxide and/or carbon monoxide is to be expected: those substances are of a very low ignition energy;

(3)Where these substances are present and where any substance of explosion group IIC is present, and where yet a potentially explosive atmosphere is expected to be present, only non-sparking tools shall be used!

9.6 Use

The linking device is only approved for intended and appropriate use. In case of non-compliance, the warranty and manufacturer’s liability do no longer apply!

a)Only such auxiliary components may be used in potentially explosive atmospheres which meet all requirements of European and national directives and legislation.

b)The environmental conditions specified in the manual have to be followed strictly.

c)The linking device is not to be used in systems where cathodic systems for corrosion protection are in place. Although special precautions may make that possible (additional earthing bridges), the manufacturer has to be consulted in each case.

d)The operator has to provide measures for protection against lightning.

e)The maximum surface temperatures depend on the circumstances of installing the equipment, and the customer or operator is responsible for those. During intended operation no temperature increases of > 20 K are to be reached at the outside parts of the enclosure. Thus temperature T4 is maintained.

f)All outside parts are made from suitable low-sparking materials. Nevertheless, the operator has to inspect any ignition hazards that may be caused by sparks when operating the entire machine. Parts containing light metal alloys have to be installed in a way that they are protected against external impact.

g)In explosion group IIC and Zone 1 no projected plastic surfaces > 20 cm³ are allowed; in IIB or dust-Ex, 100 cm² may be reached.

h)Dust settlements have to be removed regularly.

i)The company installing the device has to ensure that the transient characteristic is limited to 40% above the service voltage.

j)Icing is not permitted!

9.7 Maintenance and repair

Definition of terms according to IEC 60079-17:

Maintenance: defines a combination of any actions carried out to retain an item in, or restore it to, conditions in which it is able to meet the requirements of the relevant specification and perform its required functions.

Inspection: defines any action comprising careful scrutiny of an item carried out either without dismantling, or with the addition of partial dismantling as required, supplemented by means such as measurement, in order to arrive at reliable conclusion as to the condition of an item.

Visual inspection: defines an inspection which identifies, without the use of access equipment and tools, those defects, such as missing bolts, which will be apparent to the eye.

page 84 of 85

V1.3

Image 84
Contents Softing Linking Device V1.31 Table of Contents Configuration ConfigurationSettings FF-CONF Configure your plantTrace Log List and properties view Glossary Safety Notes Scope of DeliveryIntended Use System RequirementsOverview Hardware FG-110 FF LED Block MeaningPower Supply Ethernet PortPin MDI Signal Pinout Standard Ethernet Cable Pin # Signal DescriptionModbus Modbus serial RS232 / RS485FIM-110 FF The pre-wired Installation of the FG-110 FF FF H1 fieldbus connectionInstallation Overview Linking Device IP address Configuration PC IP address ConfigurationLinking Device FG-110 FF Internal Web Server Homepage of the Linking Device FG-110 FFInformation InformationContactInformationVersion InformationManual Diagnostics DiagnosticsSystemDiagnosticsInternet Protocol DiagnosticsFieldbusDiagnosticsAdvanced DiagnosticsAdvancedFieldbus StatisticsDiagnosticsAdvancedModbus Statistics DiagnosticsAdvancedModbus StatisticsTCP Monitor Monitor Point PagesConfiguration ConfigurationSettings ConfigurationSettingsGeneral SettingsPage 1 Configure the Internet Protocol ConfigurationSettingsLD Settings Read Current Values3 Change user accounts new Passwords ConfigurationSystem MaintenanceFirmware ConfigurationSystem MaintenanceSystem Backup ConfigurationSystem MaintenanceTime ConfigurationPage Options ConfigurationPage OptionsPoint PagesConfigurationPage OptionsPoint Columns ConfigurationPage OptionsHome ConfigurationFieldbus ConfigurationFieldbusDevices ConfigurationFieldbusBlocksConfigurationFieldbusH1 Parameter ConfigurationFieldbusHSE ConfigurationModbusCommunication ConfigurationModbusImport/Export 18 Import/Export of the Modbus Configuration FF-CONF Configure your plant Screen FF-CONF and general descriptionsMain menu ProjectEdit Build Check AllDownload Download DeviceDownload Project Settings Tool SettingsProject Settings Network Configuration HelpToolBar Icons you can use while working Main viewFunction Block Application Network LivelistParameter View Schedule ViewList and properties view Device TypesBlock Types Devices Properties Filtering the contents General InformationFloating windows Using the buttons of the objects HSE SubnetHSE Device H1 LinkUsing the context menu Start FF-CONFManaging the Device type library HSE and H1 device typesRemove a Device Type Project handling Create a New ProjectDelete Project Network configuration Configure PC and Subnet2 Add an HSE Device 5 Add an H1 Link to the HSE Device Add H1 Device Field Device to an H1 Link Network Livelist Set the online statusDisplay the Network Livelist 4 Pull down the Network Livelist Page Function Block Application Configure the Function Block application Devices first approachChange tag names Configure parameters Change Block Tags 7 Rename blocks 8 Choose a block to see or edit parameters Page 10 Add a block type Handling Host devices Error handling and troubleshooting Symptom Cause Recommended ActionsReturned Value Action MODE.ACTUAL=OOSBus parameters relevant for H1 devices RangeParameter Description Parameter Description Range/ Restriction Default value Bus parameters relevant for H1 LinksPage Glossary Term Definitions Comment Other termNetworking definitions Fieldbus definitionsTerm Definitions Page Preface General Information on Explosion Protektion Marking of equipment type labelCommissioning, installation General requirementsMaintenance and repair UseDisposal

FG-110 specifications

The Emerson FG-110 is a versatile and advanced fire and gas detection system designed for industrial applications. With increasing safety and regulatory standards in industries such as oil and gas, chemical processing, and manufacturing, the FG-110 provides a reliable solution for detecting early signs of fire and gas leaks, ensuring the protection of personnel, assets, and the environment.

One of the key features of the Emerson FG-110 is its robust detection capabilities. It is equipped with a variety of sensors for detecting different types of gases, including combustible gases, toxic gases, and oxygen levels. This multi-sensitivity approach allows for enhanced safety in environments where various hazardous substances may be present. The sensors are designed for high accuracy and fast response times, ensuring that any potential issues are detected swiftly before they escalate into more serious incidents.

The Emerson FG-110 utilizes advanced signal processing technologies. This includes sophisticated algorithms that filter out false alarms, providing operators and safety personnel with reliable notifications. The system's ability to distinguish between genuine threats and harmless environmental changes is crucial in high-stakes environments where false alarms can lead to unnecessary disruptions and safety concerns.

One of the standout characteristics of the FG-110 is its modular design, allowing for flexible configurations tailored to specific site requirements. Users can easily integrate additional sensors or modules as their needs evolve or as they expand their facility. This scalability makes it an ideal choice for both new installations and retrofitting existing systems.

In terms of communications, the Emerson FG-110 supports various protocols, enabling seamless integration with existing safety management systems and centralized control rooms. This connectivity enhances real-time monitoring and data analysis, helping safety teams make informed decisions efficiently.

Built with durability in mind, the Emerson FG-110 meets rigorous industrial standards. Its rugged casing and resistance to harsh environmental conditions ensure long-lasting performance, which is essential for operations in environments exposed to extreme temperatures, vibrations, or corrosive substances.

In summary, the Emerson FG-110 fire and gas detection system combines advanced sensor technologies, reliable performance, and modular design to deliver a comprehensive safety solution for industrial applications. With its focus on accuracy, flexibility, and integration, the FG-110 stands out as a robust tool in maintaining safety and preventing hazards in complex industrial environments.