Installation
Connecting the Servers:
Step 1
Connect all servers to the primary and secondary KVM switches. Refer to the “Connecting Servers to the PRO3 KVM Switch” section on page 11
for instructions.
Step 2
Power up the secondary KVM switches sequentially, beginning with the highest BANK, by connecting each unit’s power supply.
Step 3
Power up the primary switch. Bring up the OSD (see page 22 for OSD operation). You should see the primary KVM switch display the digits “00”, indicating its BANK address.
Note: If the PRO3 KVM Switches do not enumerate correctly, reset the primary KVM switch (BANK 00) by cycling the power. If the KVM switches still do not enumerate correctly, check that all
Step 4
Verify that the primary KVM switch has detected all secondary KVM switches by scrolling through the BANKs using the “Page UP” and “Page Down” keys while the OSD is active.
1
2
3
4
5
6
7
8
section
18