Belkin PRO2 user manual Example of Daisy-Chain Configuration, Connecting the Computers

Page 17

I N STA L L AT I O N

Example of Daisy-Chain Configuration:

Slave Input

VGA

VGA08

USB 08

VGA07

06

VGA 06

USB 06

VGA05

VGA04

USB 04

VGA03

VGA

02

USB 02

VGA01

Master Input /Slave Output

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08

USB 07

07

 

06

USB 05

05

04

USB 03

03

02

 

USB 01

01

cable 1

 

Master unit

(BANK 00)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Slave Input

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VGA

VGA08

USB 08

VGA07

06

VGA 06

USB 06

VGA05

VGA04

USB 04

VGA03

VGA

02

USB 02

VGA01

Master Input /Slave Output

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08

USB 07

07

 

06

USB 05

05

04

USB 03

03

02

 

USB 01

01

 

 

 

Slave unit

 

(BANK 01)

 

 

 

 

 

cable 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Slave Input

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VGA

VGA08

USB 08

VGA07

06

VGA 06

USB 06

VGA05

VGA04

USB 04

VGA03

VGA

02

USB 02

VGA01

Master Input /Slave Output

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08

USB 07

07

 

06

USB 05

05

04

USB 03

03

02

 

USB 01

01

cable 3

 

 

Slave unit

 

(BANK 02)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Slave Input

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VGA

VGA08

USB 08

VGA07

06

VGA 06

USB 06

VGA05

VGA04

USB 04

VGA03

VGA

02

USB 02

VGA01

Master Input /Slave Output

 

 

 

 

 

 

 

 

 

 

 

 

 

 

08

USB 07

07

 

06

USB 05

05

04

USB 03

03

02

 

USB 01

01

 

 

 

Slave unit

 

(BANK 03)

 

 

 

 

 

Connecting the Computers:

9.Connect all computers to the Master and Slave switches. Refer to “Single PRO2 Installation” on page 10 for instruction on how to connect the Console and the computers to the PRO2.

10.Connect the power supply to the Master switch. Power up the Master switch. You should see the Master switch light up and display the digits “00”, indicating its BANK address.

11.Power up the Slave switches sequentially, beginning with Bank 01, by connecting each unit’s power supply. Each switch should display its corresponding BANK address number as it is powered up.

Note: If the PRO2s do not enumerate correctly, reset the Master switch (BANK 00) by simultaneously pressing the "BANK +" and "BANK –" buttons. You can also reset the Master switch to detect newly added Slave switches.

If the switches still do not enumerate correctly, check that all switches have the correct BANK address assigned to them and that all daisy-chain cables are connected properly.

12.Verify that the Master unit has detected all Slave switches by scrolling through the BANKS using the BANK up and BANK down buttons.

If all Slave switches are detected properly, the LED display on the Master switch will register and display the attached Slave switch’s BANK address.

15

Image 17
Contents OmniView Overview TA B L E O F C O N T E N T SOmniView Package ContentsE RV I E W Feature OverviewFront-Panel Push Button Equipment RequirementsLED Display Seven-Segment LED DisplayOperating Systems Side View of the PRO2 Back View of the PRO2 Front View of the PRO2Max. Resolution 2048x1536@85Hz Bandwidth 400MHz SpecificationsCable Distance Requirements Pre-ConfigurationSTA L L AT I O N Bracket Installation F1DA108T and F1DA116T only Step-by-Step Installation GuideInstalling the PRO2 into a Server Rack Single PRO2 Installation USB Installation Connect the Computer PS/2 InstallationUSB cables Connecting Multiple PRO2s Daisy-ChainingDIP SWITCH# Bank DIP Switch Configuration ChartConnecting the Master Switch to the First Slave Switch InstallationBefore You Begin Adding Additional Slave UnitsConnecting the Computers Example of Daisy-Chain ConfigurationUsing Your PRO2 Powering up the Systems+ + Selecting a Computer Using Keyboard Hot Key CommandsSelecting a Computer Using Direct-Access Port Selectors AutoScan ModeI N G YO U R K V M SW I T C H Bank Up and Bank Down Scroll ButtonsKeyboard Hot Key Commands On-Screen Display Menu Control AutoScan Time To update the firmware, you will need the following itemsOSD Display Time Updating FirmwareSetting the PRO2 into Flash Mode Connecting ComputersOmniView KVM Switches Belkin KVM Switches and AccessoriesMATRIX2 USB OmniView All-In-One KVM CablesOmniView Accessories and Adapters PRO2 Series FAQs PRO2 Series FAQs PRO2 Series FAQs Video TroubleshootingGeneral Mouse KeyboardMouse is not detected at boot-up USB F1DA104T, F1DA108T, F1DA116T WARRANTY, FCC , CE, Ices StatementP73782-A