Operation
Connect Equipment
CAUTION
RISK OF EQUIPMENT DAMAGE
•Adhere to all local and national electrical codes.
•Wiring should be performed by qualified electrician.
•Always connect the UPS to a grounded outlet.
Failure to follow these instructions can result in equipment damage
Note: The 2200/3000 VA 100 Vac model UPS will charge to 90% capacity in the first four and a half hours of normal operation.
All other models will charge to 90% capacity in the first three hours of normal operation
Do not expect full battery runtime capability during this initial charge period.
1.Connect equipment to the outlets on the rear panel of the UPS.
2.Connect the UPS to the building utility power.
Always connect the UPS to a two pole, three wire, grounded source.
3.To use the UPS as a master ON/OFF switch, turn on all the equipment that is connected to the UPS.
4.Press the ON/OFF button on the front panel of the UPS to turn on the UPS and all connected equipment.
See “Main Outlet Group and Controlled Outlet Group” on page 10 for information on how to configure the outlet groups.
su0441a
Rear Panel Features
Serial port: Connect to a computer to use power management software.
USB port: Connect to a computer to use power management software.
Note: Serial and USB communication can not be used simultaneously.
Ground Screw: The UPS features a ground screw for connecting the ground leads on transient voltage devices. Prior to connecting a ground lead, disconnect the UPS from utility power.
5 |