Cisco Systems DSN09EVS720ACK9 manual Chassis with horizontal slots

Page 73

Chapter 3 Installing Supervisor Engines

Installing a Supervisor Engine

Step 9 Depending on the orientation of the slots in the chassis (horizontal or vertical), perform one of the following two sets of steps:

Chassis with horizontal slots

a.Position the new supervisor engine in the slot. Make sure that you align the sides of the supervisor engine carrier with the slot guides on each side of the chassis slot. (See Figure 3-1.)

b.Carefully slide the supervisor engine into the slot until the EMI gasket along the top edge of the supervisor engine makes contact with the module or cover plate in the slot above it and the supervisor engine ejector levers have both closed to approximately 45 degrees with respect to the supervisor engine faceplate.

Figure 3-1 Positioning the Supervisor Engine in a Horizontal Slot Chassis

Insert module

 

between slot guides

EMI gasket

 

3

 

4

4

 

 

 

5

5

 

 

 

6

6

 

 

 

FAN STATUS

1

2

3

4

5

EMI gasket

o

 

o

 

INPUT FAN OUTPUT

 

FAIL

INPUT

FAN OUTPUT

O

FAIL

130908

Ejector lever fully extended

Catalyst 6500 Series Supervisor Engine Guide

 

OL-7397-03

3-5

 

 

 

Image 73
Contents Americas Headquarters Catalyst 6500 Series Supervisor Engine GuideCatalyst 6500 Series Supervisor Engine Guide N T E N T S Safety Organization AudienceChapter Title Description Convention Description ConventionsBewaar Deze Instructies Statement 1071-Warning DefinitionAvvertenza Importanti Istruzioni Sulla Sicurezza Warnung Wichtige SicherheitshinweiseAviso Instruções Importantes DE Segurança Spara Dessa Anvisningar GEM Disse Anvisninger Page Xii Related Documentation Obtaining Documentation and Submitting a Service RequestXiv Catalyst 6503 Switch Catalyst 6500 Series Switch Chassis OverviewCatalyst 6503-E Catalyst 6504-E Catalyst Catalyst 6506-E Catalyst Catalyst 6509-E Catalyst 6509-NEB Catalyst 6509-NEB-A Catalyst 6509-V-E Catalyst Catalyst 6513-E Catalyst 6500 Series Switch Chassis Overview Catalyst 6513-E OL-7397-03 Supervisor Engine 2 Product Description Number Supervisor EngineWS-X6K-S2-PFC2 WS-X6K-S2-MSFC2 Feature DescriptionWS-X6K-S2U-MSFC2 SP Nvram SP DramEnvironment SpecificationStatus Color and MeaningSystem ConsolePWR Mgmt Switch LoadLink PcmciaWS-SUP32-GE-3B Supervisor Engine 32 Product Description NumberSupervisor Engine 32 WS-SUP32-10GE-3B Front Panel Features 6lists and describes Supervisor Engine 32 featuresFeature Description Button ejects the Pcmcia card from the slot LEDMSFC2A Msfc daughter card version InstalledRed-A major hardware problem has occurred Orange-A minor hardware problem has been detectedStatus LED indicates the status of the supervisor engine System LED indicates the status of the system componentsDisk 0 Pcmcia LED ActiveWS-S32-GE-PISA Supervisor Engine 32 PisaWS-S32-10GE-PISA Pisa 10lists and describes Supervisor Engine 32 Pisa featuresFeature Description Pcmcia card from the slot Feature Description Supervisor Engine 32 Pisa Front Panel Status LEDs For Link LEDs associated with the Xenpak uplink ports, LED colors indicate the followingWS-SUP720-3BXL Numbers14lists and describes Supervisor Engine 720 features Active at one time PortWS-SUP720-3B-PFC3B WS-F6K-PFC3B WS-SUP720-PFC3A WS-F6K-PFC3AWS-SUP720-3BXL-PFC3BXL WS-F6K-PFC3BXL 16 Supervisor Engine 720 Front Panel Status LEDs Supervisor Engine 720-10GE Supervisor Engine 720-10GE Front Panel Features18lists and describes Supervisor Engine 720-10GE features Supervisor Engine 720-10GE Features MSFC3 WS-F6K-MSFC3 VS-S720-10G-3CXL-PFC3CXL WS-F6K-PFC3CXLSpecification Supervisor Engine 720-10GE Front Panel Status LEDs Disk Link Supervisor Engine 2T Release/notes/ol20679.html 22lists and describes Supervisor Engine 2T featuresTsdevicesupporttableslist.html DramFeature Specification Disk Supervisor engine for servicing purposesOperation Link 10GE Uplink Link SFP UplinkOL-7397-03 Safety Installing Supervisor Engines Required Tools Installing a Supervisor EngineInstalling Supervisor Engines Installing a Supervisor Engine Installing Supervisor Engines Installing a Supervisor Engine Insert module Between slot guides EMI gasket Chassis with horizontal slotsPress down Positioning the Module in a Vertical Slot Chassis Chassis with vertical slotsClearing the EMI Gasket in a Vertical Slot Chassis Installing Supervisor Engines Installing a Supervisor Engine Horizontal slots Removing a Supervisor EngineVertical slots Captive Installation Screw Ejector lever1029 Installing the Cisco Microsoft Windows USB Device Driver USB Console Port Driver InstallationInstalling the Cisco Microsoft Windows XP USB Driver Using the Add or Remove Programs utility Uninstalling the Cisco Microsoft Windows USB DriverUsing the Setup.exe program Attaching the Network Interface Cables Installing Pluggable TransceiversMode-Conditioning Patch Cord Attaching Optical Network Interface CablesTransceiver Mode-Conditioning Patch Cord Usage XENPAK-10GB-LRM= Xenpak LRMX2 LRM RX TX Connecting Transceivers to a Copper Network Where to Go NextGbic Supervisor Engine Number of PortsSFP XenpakAppendix a Pluggable Transceivers Console Port Cables and Adapters Console PortFigure B-1 Identifying a Rollover Cable Console Port Mode Switch Supervisor Engine 2 OnlyRJ-45-to-RJ-45 RJ-45-to-DB-9 Console Rollover Cable Signal RJ-45 Pin DB-9 PinDevice DSR DCD CTS RTS DTRConsole Port Console Device Pin signal Input/Output Console Port Mode 2 Signaling and PinoutsUplink Ports Supervisor Engine Number Type of Uplink Port Uplink PortsLX4 Transceiver Type Cabling GuidelineRJ-45 Connector Copper and Fiber-Optic ConnectorsUSB Ports CX4SC Connectors Fiber-Optic ConnectorsLC Connectors OL-7397-03 Attaching Your ESD Grounding Strap ESD PrecautionsCatalyst 6500 Series Supervisor Engine Guide Clip OL-7397-03 D E IN-2 Network cables installing 3-17uplink portsFront panel figure Power requirement Fan tray requirements Reset switch Front panel figureFront panel features 2-28front panel LEDs table memory