Contents
General Precautions
Protecting Against Electrostatic Discharge
Rack Installation Safety Guidelines
Ensuring Proper Airflow
Stabilizing the System
Lifting the System
C H A P T E R 3 | Installing the Cisco Global Site Selector 4490 |
| ||
| Unpacking and Inspecting the Global Site Selector 4490 | |||
| If the Product is Damaged |
|
| |
| Tools and Parts Required |
|
| |
| Installing Your Unit |
|
| |
| Installing the Chassis in a |
| ||
| Installing the Chassis in a |
| ||
| Installing the Chassis on a Workbench or Tabletop | |||
| Connecting Cables |
|
| |
| Connecting Power |
|
| |
| Booting the System |
|
| |
| Checking the Front Panel LEDs |
|
| |
| Removing or Replacing a Cisco Global Site |
|
| |
| Selector 4490 |
|
|
|
| Troubleshooting the System Hardware |
|
| |
C H A P T E R 4 |
|
| ||
| Checking the Basics |
|
| |
| Checking Connections |
|
| |
| Maintaining the Cisco Global Site Selector 4490 |
| ||
C H A P T E R 5 |
| |||
| Maintaining Your Site Environment |
|
| |
| Temperature |
|
|
Cisco Global Site Selector 4490 Hardware Installation Guide
vi |
| |
|