Cisco Systems
4490
appendix
Installing the Cisco Global Site Selector, C H A P T E R
Install
Connecting Cables
Slide rail assembly
Adjustment screw
Connecting Power
Page 1
Page 1
Page 2
Image 1
Page 1
Page 2
Contents
C H A P T E R
Installing the Cisco Global Site Selector
Unpacking and Inspecting the Global Site Selector
Cisco Global Site Selector Hardware Installation Guide
If the Product is Damaged
Tools and Parts Required
83198
Figure 3-1 Four-Post Rack Installation Kit
Installing Your Unit
Figure 3-2 Installing Clip Nuts or Cage Nuts in a Non-Threaded Rack
Installing the Chassis in a Four-Post Rack
Slide rail assembly
Figure 3-4 Attaching the Inner Slide Rail to the GSS
2 Adjustment screw
Release tab
3-10
Installing the Chassis in a Two-Post Rack
3-11
Cisco Global Site Selector 4490 Hardware Installation Guide
Chapter 3 Installing the Cisco Global Site Selector
Repeat this step to secure the left side bracket to the rack
3-12
3-13
Installing the Chassis on a Workbench or Tabletop
3-14
Connecting Cables
Booting the System
Connecting Power
3-15
3-16
Checking the Front Panel LEDs
Color
State
3-17
Removing or Replacing a Cisco Global Site Selector
Table 3-1 Front Panel LEDs continued
To physically remove a GSS 4490 from your network, follow these steps
3-18
To physically replace a GSS 4490, follow these steps
3-19
3-20
Related manuals
Manual
94 pages
36.36 Kb
Manual
92 pages
54.88 Kb
Related pages
All Install page
Post-installation setup for Xerox 701P47169
INSTALLING for Vanguard Heating VP1600ITA
Vent Pipe Installation for Nordyne M3RL
Installation Location for Panasonic KX-HNC600
Hardware Installation for LG Electronics GDK-20W
Installing the Colour Option for Epson MTX 1345
Hardware Preparation and Installation for Emerson AMC-S402
Instructions d’installation for GE GFE28HSHSS
Installation af skærmdriveren manuel for Samsung LS26TWQSUV/EN
Installing the batteries and charging the cordless handset for Sharp UX-D50
How do I connect the wires for my ceiling fan?
Learn more about wiring
Top
Page
Image
Contents