Cisco Systems
4490
appendix
3-12, Repeat this step to secure the left side bracket to the rack
Install
Connecting Cables
Slide rail assembly
Adjustment screw
Connecting Power
Page 12
Page 11
Page 13
Image 12
Page 11
Page 13
Contents
Installing the Cisco Global Site Selector
C H A P T E R
Cisco Global Site Selector Hardware Installation Guide
Unpacking and Inspecting the Global Site Selector
Tools and Parts Required
If the Product is Damaged
Figure 3-1 Four-Post Rack Installation Kit
83198
Installing Your Unit
Installing the Chassis in a Four-Post Rack
Figure 3-2 Installing Clip Nuts or Cage Nuts in a Non-Threaded Rack
Slide rail assembly
Figure 3-4 Attaching the Inner Slide Rail to the GSS
2 Adjustment screw
3-10
Release tab
3-11
Installing the Chassis in a Two-Post Rack
Cisco Global Site Selector 4490 Hardware Installation Guide
Chapter 3 Installing the Cisco Global Site Selector
3-12
Repeat this step to secure the left side bracket to the rack
Installing the Chassis on a Workbench or Tabletop
3-13
Connecting Cables
3-14
Connecting Power
Booting the System
3-15
Checking the Front Panel LEDs
3-16
Color
State
Removing or Replacing a Cisco Global Site Selector
3-17
Table 3-1 Front Panel LEDs continued
3-18
To physically remove a GSS 4490 from your network, follow these steps
3-19
To physically replace a GSS 4490, follow these steps
3-20
Related manuals
Manual
94 pages
36.36 Kb
Manual
92 pages
54.88 Kb
Related pages
Troubleshooting Audio-Video Connections for Sony PCGNV200
RF Specifications for Panasonic KX-TCA255
Numeric error codes for Lenovo R60E
Wiring Diagram for Grizzly G9972Z
Displays Guardar Save when Cool SavingsTM is working for White Rodgers 1F80ST-0471
Install Field Control Wiring for Carrier 50HQP072-120
Electrical Cabinet & Control Panel Parts List for Southbend sb1015f
Language code list for Panasonic SC-BTT750
Where can I find the
Mellerware induction cooker manual
online?
Top
Page
Image
Contents