Site Requirements Guidelines
Power Guidelines
The Cisco 12008 router can be configured with either
Note Combining an
A minimally configured router has one
Observe the following general precautions and recommendations in planning the source power requirements for your router:
•Check the power at your site before router installation (and periodically after installation) to ensure that clean power is being received. Install a line conditioner, if necessary, to ensure proper voltages and power levels in the source voltage for the system.
•Install proper grounding for the site to avoid damage from lightning and power surges.
AC-Powered Systems
In a router to be equipped with
•The power supply must operate with a source voltage ranging from 185 to 264 VAC; the
•Several styles of
All
•Check the power at your site before installation and periodically thereafter to ensure that you are receiving clean power that is free of noise. Install a line conditioner, if necessary, to ensure proper electrical characteristics of source power.