Installing the 9Cx14 Chassis
Installation Order
Once a suitable site has been chosen, the SmartSwitch 9000 may be installed. The unit may be free standing or rack mounted.
It is recommended that the SmartSwitch 9000 installation proceed in this order:
1.Mount the chassis to the rack or other secure location.
2.Install the power supply(ies).
3.Attach the Electrostatic Discharge (ESD) Wrist Strap.
4.Install the Environmental Module.
5.Install the Interface Modules.
6.If necessary, install the INB Terminator Modules.