Cabletron Systems FPIM-02 manual LANVIEW LEDs, LED Color, State, Description

Page 24
LANVIEW LEDs

LANVIEW LEDs

The functions of the two System Status LEDs, System Management Bus (SMB) and the CPU, are listed in Table 4-1.

Table 4-1. System Status (SMB and CPU) LEDs

LED Color

State

Description

 

 

 

Green

Functional

Fully operational.

 

 

 

Yellow

Testing

Power-up Testing

 

 

 

Yellow (flashing)

Crippled

Not fully operational (i.e., one bad port).

 

 

 

Yellow/Green

Booting

Blinks yellow and green while booting.

 

 

 

Red

Reset

Normal power-up reset.

 

 

 

Red (Flashing)

Failed

Fatal error has occurred.

 

 

 

Off

Power off

Module powered off.

 

 

 

The functions of the INB receive LED are listed in Table 4-2.

 

Table 4-2. INB Receive LED

 

 

LED Color

State

 

 

 

 

Green (Flashing)

Link, Port Disabled

 

 

Green

Link, Port Enabled, No activity

 

 

Yellow (Flashing)

Link, Port Enabled, Activity

 

 

Red

Fault

 

 

Off

No Link

 

 

The functions of the INB transmit LED are listed in Table 4-3.

 

Table 4-3. INB Transmit LED

 

 

LED Color

State

 

 

 

 

Green (Flashing)

Data Activity

 

 

Yellow (Flashing)

Port in Standby State

 

 

Red (Flashing)

Collision

 

 

Red

Fault

 

 

Off

No activity, Port Disabled

 

 

4-2

Image 24
Contents SmartSwitch 9M426-02 User’s Guide 9032531-01Page Copyright February 1998 by Cabletron Systems, Inc 35 Industrial Way FCC Notice VCCI NoticeDOC Notice DECLARATION OF CONFORMITY ADDENDUM Nexus House, Newbury Business ParkConformance to Directives/Product Standards Page Contents Contents Features IntroductionChapter Introduction ConnectivityManagement Information Base MIB Support LANVIEW LEDsFigure 1-1. The 9M426-02 Module 9M426-02SMB CPU INB Related Manuals Getting HelpSmartSwitch 9000 Installation Guide SmartSwitch 9000 9C300-1 Environmental Module User’s GuideInstalling the SmartSwitch 9000 Module User Accessible ComponentsUnpacking the Module Installing the SmartSwitch 9000 Module SMB-1 PROM i960 Processor Boot PROMDIP Switch Local DRAMSee the Cautions at the end of this table Installing the Module into the SmartSwitch 9000 Chassis Ensure that the circuit card is between the card guides Jack for ESD wrist strap Metal Back-Panel Circuit Card Card GuidesThe Reset Switch Operation System Management BusesSystem Diagnostic Controller SecureFast SwitchDC/DC Converter INB Interfacei960 Core Operation LANVIEW LEDs System Status FNB Transmit9M426-02 FNB ReceiveLANVIEW LEDs LED ColorState Specifications SafetyTechnical Specifications Service Physical