Cabletron Systems FPIM-02 manual See the Cautions at the end of this table

Page 15
See the Cautions at the end of this table.

Installing the SmartSwitch 9000 Module

An eight position DIP switch is located on the module card as shown in Figure 2-1. The function of the switches are listed in Table 2-1.

See the Cautions at the end of this table.

Table 2-1. Function of DIP Switch

Switch

Function

Description

 

 

When toggled, this switch clears user-entered

8

Clear

passwords stored in NVRAM, and restores the

Password 1

default passwords. Once reset you can use the

 

 

 

defaults or enter new passwords.

 

 

 

 

 

The module uses NVRAM to store user

 

 

entered parameters such as IP addresses,

 

 

device name, etc. To reset these parameters to

7

Clear

the factory defaults, toggle this switch. Once

NVRAM 2

reset you can use the defaults or enter new

 

 

 

parameters which are stored in NVRAM when

 

 

the module is powered down, and remain

 

 

there until the switch is toggled again.

 

 

 

 

 

Toggling this switch after pulling the board

 

 

out of the SmartSwitch 9000, clears download

 

Force BootP

information from NVRAM and forces image

6

files to be downloaded from the station

Download

 

connected to the EPIM on the Environmental

 

 

 

 

Module configured to act as that modules’

 

 

BOOTP server.

 

 

 

5

Reserved

For Factory Use Only

 

 

 

4

Reserved

For Factory Use Only

 

 

 

3

Reserved

For Factory Use Only

 

 

 

2

Reserved

For Factory Use Only

 

 

 

1

Reserved

For Factory Use Only

 

 

 

!

CAUTION

1.Caution: Do not toggle Switch 8 unless you intend to reset the user configured passwords to their factory default settings.

2.Caution: Do not toggle Switch 7 unless you intend to reset the user parameters to the factory default settings.

2-3

Image 15
Contents 9032531-01 SmartSwitch 9M426-02 User’s GuidePage Copyright February 1998 by Cabletron Systems, Inc 35 Industrial Way FCC Notice VCCI NoticeDOC Notice DECLARATION OF CONFORMITY ADDENDUM Nexus House, Newbury Business ParkConformance to Directives/Product Standards Page Contents Contents Features IntroductionChapter LANVIEW LEDs IntroductionConnectivity Management Information Base MIB SupportFigure 1-1. The 9M426-02 Module 9M426-02SMB CPU INB SmartSwitch 9000 9C300-1 Environmental Module User’s Guide Related ManualsGetting Help SmartSwitch 9000 Installation GuideInstalling the SmartSwitch 9000 Module User Accessible ComponentsUnpacking the Module Local DRAM Installing the SmartSwitch 9000 ModuleSMB-1 PROM i960 Processor Boot PROM DIP SwitchSee the Cautions at the end of this table Installing the Module into the SmartSwitch 9000 Chassis Jack for ESD wrist strap Metal Back-Panel Circuit Card Card Guides Ensure that the circuit card is between the card guidesThe Reset Switch System Management Buses OperationINB Interface System Diagnostic ControllerSecureFast Switch DC/DC Converteri960 Core Operation FNB Receive LANVIEW LEDsSystem Status FNB Transmit 9M426-02LANVIEW LEDs LED ColorState Specifications SafetyTechnical Specifications Physical Service