EMC 4K VA 20K VA UPS installation manual Wall installation, Installation with rear Bracket

Page 23

(4)Wall installation:

Move the mounting brackets from the front to the side and attach the brackets by screws. Then mount the UPS to the wall as the below pictures shown.

(5)Installation with rear Bracket:

We can use bracket to support the rear side of UPS or battery cabinet.

40

Image 23
Contents Declaration of Conformity Request 4K VA 20K VA UPSImportant Safety Instructions Save These Instruction General description IntroductionSystem description Efficiency Optimizer function System configurationFree Run Mode Diagnostic testsEnvironment Safety informationInstallation StorageRear panel views 6KVA Rear panel With ISO 8K~10KVA Rear panel Without ISO 8K~10 KVA 12KVA Rear panel ISO and With ISO Or kill personnel and damage equipment Connection to mains and loads 4000 20000 VAOnly required if demanded by that of local wiring rules RS-232 Standard Interface port Computer and alarm connectionsDefault settings at the factory Connecting the UPS to a ComputerButton operation EPO port emergency power offUser’s guide to operations Starting and shutting down the UPSLCD message Control panel functionsNormal display UPS meters displayManual test of the UPS UPS configurationsInterpreting UPS messages Alarm indicatorsSilencing an alarm Trouble shooting MaintenanceFor model with 3 Phase in 1 Phase out Technical SpecificationsFor Rack mount model 6K-ISO TB VGD RM 6KVA3U+3U Mechanical Connect the Battery cabinet to UPSPage Tower installation Installation with rear Bracket Wall installation