Installation and Operation
Mounting the YCV 100, VYC 100N, & VYC 100P
The YCV 100, VYCN, and VYC 100P can be set on a table or mounted on a rack shelf, under a desk or tabletop, or on a projector mount.
Tabletop use
Four
UL rack mounting guidelines
The following Underwriters Laboratories (UL) guidelines pertain to the safe installation of the YCV 100, VYC 100N, and VYC 100P in a rack.
1. Elevated operating ambient temperature — If installed in a closed or
2. Reduced air flow — Install the equipment in a rack so that the amount of air flow required for safe operation of the equipment is not compromised.
3. Mechanical loading — Mount the equipment in the rack so that a hazardous condition is not achieved due to uneven mechanical loading.
4. Circuit overloading — Connect the equipment to the supply circuit and consider the effect that circuit overloading might have on overcurrent protection and supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern.
5. Reliable earthing (grounding) — Maintain reliable grounding of
Rack mounting
For optional rack mounting, do not install the rubber feet. Mount the YCV 100, VYC 100N, or YCV 100P, on a VersaTools™ rack shelf (RSF 123, Extron part
part
part
On the standard rack shelf, the YCV 100, VYC 100N, and VYC 100P mount in one of eight locations to the rear of the shelf or in one of eight locations to the front of the shelf.
1. | Remove rubber feet if they were previously installed on |
| the bottom of the unit. |
2. | Mount the unit on the rack shelf, using two |
| screws in opposite (diagonal) corners to secure the unit to |
| the shelf. |
3. | Install blank panel(s) or other unit(s) on the rack shelf. |
VersaTools
Rack Shelf
Quarter Rack Width
False Front Face Plate
Eighth Rack Width
False Front Face Plate
(2)
Mounting the YCV 100, VYC 100N, and VYC 100P on a VersaTools rack shelf
YCV 100, VYC 100N, VYC 100P • Installation and Operation | YCV 100, VYC 100N, VYC 100P • Installation and Operation |