Install Machine Supports

Install Machine Supports

INSTALL STANDARD ISOLATION Ð Figures 13-18 show the position of support plates and shear ¯ex pads that form the standard machine support system.

INSTALL OPTIONAL OR ACCESSORY ISOLATION (if required) Ð Uneven ¯oors or other considerations may

 

 

HEAT EXCHANGER SIZE

 

 

 

 

 

 

DIMENSION

10 or 11

20 or 21

 

 

 

 

 

 

 

 

ft-in.

 

mm

ft-in.

 

mm

 

 

 

 

 

 

 

A

4-51¤4

 

1353

4-71¤4

 

1403

B

4-41¤2

 

1334

4-61¤2

 

1384

C

1-03¤8

 

314

1-13¤8

 

340

dictate the use of soleplates and leveling pads. Refer to Fig. 13-18.

Level machine by using jacking screws in isolation sole- plates. Use a level at least 24 in. (600 mm) long.

NOTES:

1.Dimensions in ( ) are in millimeters.

2.Use grout and package components to establish the level base line.

3.If chiller is set on concrete pad, electrical contractor is to locate conduit stub-ups outside of pad. Approximate location shown.

4.See Fig. 15 and 16 for additional information.

Fig. 13 Ð 23XL Machine Footprint (Frame 1 and 2 Machines)

NOTES:

1.Dimensions in ( ) are in millimeters.

2.Use grout and package components to establish the level base line.

3.If chiller is set on concrete pad, electrical contractor is to locate conduit stub-ups outside of pad. Approximate location shown.

4.See Fig. 15 and 16 for additional information.

Fig. 14 Ð 23XL Machine Footprint (Frame 4 Machine)